Samrangjin Project Hydro Power Plant 2x330MW Electrical Balance of Plant storage pumped power unit
Planning Installation works, quotes of works
RAMS -Risk assessment method of statement
The FAT factory conducts assembly tests for electrical equipment.
Preparation site: manpower, tools, etc
Control, check electrical drawings, and Review design.
Our system includes quality, safety, ITP inspection technical plans, and environment management.
Managed all erection and commissioning, repair, and maintenance works at Iron Gate 1 Hydroelectric Power Plant:
*Generators 200 MW Kaplan Vertical
*Power Transformers 216 MVA.
*460 Vac main distribution panels
*MV panels 6 KV
* Lighting and sockets
*IPB 15.75 KV insulation phase bus-duct
*Overhead crane
*Motors
RAMS -Risk assessment method of statement
Preparation site: manpower, tools, etc
Control and check electrical drawings and design review.
Quality system: safety, ITP inspection technical plan, and environment
Erection of electrical tests for hydro-generators 32 MW, Power Transformers to 63 MVA, Motors,
Excitation System, MV panels, Low voltage panels, CT, VT, circuit-breakers 110 KV, Control System panels, protection panels for generator, power transformers, and lines HV.
Test electrical protection relays and automation hydro generator of the hydroelectric power plant.
Erection of automation cabinets control system and external connections.
Assembly, erection, and commissioning.
HV tests generator, power transformer, MV cable, and IPB.