* To explore a challenging position that would enhance my skills and knowledge in partnership with company's mission and vision.
* To promote professionalism within an organization through required and skills.
Project Name: UZ-KOR GAS CHEMICAL PLANT-UGCC ETHYLENE GAS PROJECT
Job Description:
*Direct and supervised the planning, lay-out, installation, assembly and erections of pipe support and structures in accordance with all applicable plans, specification codes and industry standards plan and coordinate the efforts and I work with the workers to teach and motivate them to accomplish the work safely, correctly and efficiency.
Project Name: GNL-32 PROJECT
Job Description:
Experience in 1 year 3 months as pipe support supervisor in the field of erection, fabrication, welding activities and quality control, for various construction project in oil and gas, structural erections and pipe support installation and fabrication.
Duties and Responsibilities:
* Preparing and monitoring of installation of pipe support, structures and fabrication, sequencing as per code and standard during installation and fabrication work, is performed in accordance with the approved construction procedure, specification and correct material.
* Performing the job according to fabrication drawing and project client specification.
* Monitoring foreman daily production fit-up, welding records, reports the status performance to the construction precaution for the task carry out job safely without LTI or lost time injury.
Project Name: PEARL GAS TO LIQUID (PGTL) PROJECT
Job Description:
Responsible for lay out and fabricating structural steel and sheet metal and pipe support in order to build metal structures. Welds and cuts steel, interprets blue print and standard drawing and works with concrete reinforcing steel bars.
Job Description:
During that time as Iron worker foreman, I' am working with my team for fit-up pipe support steel erector and monitoring the classification of materials. I was responsible for my duty in distribution required in every activity within the area of my responsibility of the ongoing activity in relation with the needed welding.
Job Description:
Perform lay-out, cutting, fitting as Iron worker shell flat form prior to installation of shell patting way of building and structural erector. Weld vertical, horizontal and overhead position seam which are all subject to 100% radiographic test requirement. Often assigned in defected weldnest.
Project Name: BATAAN POWER PLANT
Job Description:
Pressure include Iron Worker, Pipe support, Pipe Rock steel erector, and Millwright. coordinate with the process operation and safely devices written in work permit and signed by authorized personnel. communication with my co-worker all about our working activities always maintain good as Iron worker and attending meeting once a week.