Summary
Overview
Work history
Education
Skills
Languages
Timeline
RegisteredNurse
RASHAD METWALLY

RASHAD METWALLY

Head of Engineering and projects
Ismailia,Egypt

Summary

Solutions-oriented engineering professional with strong understanding of product development process. Brings excellent interpersonal and communication skills to work effectively with colleagues, management and vendors. Proactive in identifying areas of improvement and taking steps to drive successful completion of projects.

Overview

31
31
years of professional experience

Work history

Head Of Engineering and Projects - Africa

PZ Cussons - Nigeria
Ikorodu - Lagos , Nigeria
11.1999 - Current
  • General sites HSE management
  • Sustainability and ESG
  • Fixed Assets and Capitals management
  • Projects planning, implementation, cost management
  • Availability and capacity utilisation management
  • Asset renewal, upgrade and depreciation management
  • · Projects and Assets projects visibility studies
  • NPD, MI and technical project
  • Energy and resources management
  • Engineering budget and cost control PPM, Capex
  • General manpower and KPI`s set and review
  • Evaluated operation and performance of equipment, components and systems.
  • General site services management
  • Applied mechanical knowledge to optimise equipment components for durability, cost, or ease of production.
  • Sourced sustainable materials for designs, reducing environmental impact.
  • Worked with SolidWorks and AutoCAD to draft assemblies, models and technical drawings.

Chief Engineering manager

PZ Cussons PLC
Aba, Abia State
04.2015 - 01.2019
  • Responsibilities
  • Projects planning and achievements
  • HSE
  • PPM, LLF, CIL (function & Team management)
  • Infra structure and projects management
  • Continuous improvement and optimization
  • Energy Generation and distribution
  • Utilities generations
  • Costing and cost saving
  • Capex control and Visibility study
  • Housekeeping, General appearance and 5S
  • Spare parts recruiting, Control and Stock movement
  • Fleet and transportation (Vehicle and forklifts)
  • Machinery / Equipment handled
  • Saponification process, 10,000 and 12,000 from Binacchi and Mazzoni
  • Soap Noddle's plants from Binacchi and Mazzoni
  • Oil Bleachers plant Ama
  • Tank farms for oil, silicate and Caustic Soda
  • Soap noodles Plants, Binacchi and Mazzoni
  • Finishing and Packaging line
  • Plodders, Mixers, Refineries
  • Utilities, Chillers ICS, York, V cut, Trane chillers, Compressors Atlas Copco ZR200, ZR4, Boilers Cochran and Thermax ,, Cooling tower
  • Gas Generators Cummins, Cater pillar Diesel and Perkins diesel generators
  • Synchronisation system between generators
  • Power distribution at medium tension system-step up-transformers and closed ring system
  • Low volt transformer and Distribution-step down- and control panel system

Head of Engineering

Iffco Egypt
Suez - Ababiah industerial area , Suez
12.2012 - 03.2015
  • New projects
  • HSE
  • Projects
  • TPM
  • General utilities
  • Modification and developments
  • CIL development and managements
  • Spare parts management
  • General layout
  • Electrical management
  • Land scape and general appearance
  • Machinery / Equipment handled
  • Complete refinery (neutralization - dew axing - washing - bleaching - polishing) plant Desmet 1,100 ton/ day
  • Separators (Westphalia)
  • Deodorization plant (Desmet)
  • Filling lines and packaging
  • Utilities (chiller - boiler -Compressor)
  • PALM oil process plant (WESTFALLIA)
  • Shortening plant (Schroder)
  • Soap plant (packaging) (MAZZONI - PFM)
  • Laundry Soap noodles line (Mazzoni)
  • Hydrogen Plant from Hydrogenix,120m3/hr
  • Re-esterification plant with Enzyme system, Novazym

Group Engineering manager

Arma - HSA
10th of Ramadan City - Industrial Zone 2, 10th of Ramadan City
09.2010 - 12.2012
  • Projects
  • Team management over 120 personnel as Group Engineering organization
  • Technical management for AFD (Food/ Ghee, specialty fats shortening and margarine plant)
  • Technical management for AOD (Oil refinery 1,500 T/day, filling lines, Packaging lines)
  • Technical management for ASD (Personal care plant, liquid soap, Toilet soap, and Detergent)
  • General utilities
  • Fleet and Vehicle
  • Projects and Infra structures
  • Energy management and cost control
  • Spare parts and other facilities
  • Central work shop
  • TPM and SAAP system on maintenance Module
  • Capex management
  • Installation and commissioning
  • Machinery / Equipment handled
  • Complete refinery (neutralization - dew axing - washing - bleaching - polishing) plant (OILTEK)
  • Separators (Westphalia)
  • Deodorization plant (Desmet)
  • Filling lines and packaging (FILLPACK-SACMI)
  • Blowing machines (BLOWMAX-SIPA-NISSAI)
  • Injection machine (HUSKY)
  • Utilities (chiller - boiler -11kv distribution- transformer)
  • PALM oil process plant (WESTFALLIA)
  • Hydrogenation plant (OILTEK)
  • Shortening plant (PADOVANI)
  • Detergent plant (BALLESTRA)
  • Soap plant (packaging) (MAZZONI - PFM)
  • Sulphuric acid process plant (BALLESTRA)
  • Soap noodles process plant (Mazzoni)
  • Tin can make plant
  • Work in Honey well as Electrical Engineering manager from

Engineering manager

Honywell
10th of Ramadan City - industrial Zone , 10th of ramadan City
08.2008 - 09.2010

Responsibilities

  • Responsible for engineering dept
  • Honeywell and chocolate mill refining
  • Biscuit line soft and hard lines
  • Gum producing line
  • Sweet and candy lined
  • Chocolate making Mixers
  • Wafer lines
  • Machinery / Equipment handled
  • Gas oven for biscuit lines
  • Z mixers for gum dough
  • Roll mill for chocolate refine
  • Waver Biscuit ovens decorating
  • Chocolate submersed machine
  • Flow wrap machine
  • Multi bags Filling Machine

Maintenance manager

Edita Food Industry
10th of Ramadan City - Industerial zone 2 , 10th Of Ramadan
08.2003 - 08.2008
  • Machinery / Equipment handled
  • Gas backing oven for biscuit lines
  • Cooling Tunnel
  • Electronic cutters
  • Swiss roll forming M/C
  • Line end packing
  • HVAC
  • Slurry mixers for Cream injection Machine
  • Mill for chocolate refine
  • Waver Biscuit ovens decorating
  • Chocolate submersed machine
  • Flow wrap machine
  • Utilities
  • General Site services & maintenance
  • Forklift and Company fleet

Factory manager

Egypt Sack
October City Industrial zone 5, October City
08.1997 - 08.2003
  • Kraft paper sack company for making cement, Gypsum and flower packaging
  • Operation management, Quality, Production and maintenance
  • Supply chain management
  • Team work management
  • Work in, electronics Egypt as a maintenance
  • Held team meetings to discuss product value and vision while allowing team members to give ideas and suggestions.
  • Evaluated current production processes and made forward-thinking adjustments to improve output.
  • Established and adjusted work procedures to meet production schedules, delivering output to deadlines.
  • Supervised production schedules and production quality for timely delivery
  • Led regular meetings, events and continuous improvement projects with measurable goals.
  • Developed and maintained clear communication and rapport with plant personnel.

Maintenance Section Head

LG Electronics SAE
Ismailia, Ismailia
12.1993 - 08.1997
  • TV component factory maintenance
  • Maintain and operate the component production line machine
  • Utilities optimisation
  • Plastic injection M/C
  • Cooling Tower
  • HVAC
  • MHE and Company Fleets


Maintain and operation site Engineer

Arab contractor
South Sinai , South Sinai
05.1992 - 12.1993
  • Water treatment Plant
  • Operate and maintain
  • Water Sully Projects
  • Mega CF Pumps repair and maintain
  • Diesel Generator Operate and maintain


Education

Total Productive maintenance (TPM) -

2009

Failure Mode and Effect Analysis-FMEA - undefined

2009

HACCP - undefined

2005

TPM-Total Preventive Maintenance - undefined

1997

Problem Solving Skill Program Complete Course -Super A, Germany and U.K - undefined

1996

Project Management, Germany - undefined

1996

Quality Management System-Internal Auditor-ISO 9002 - undefined

1996

Innovation of Production System, 5 S Activities, South Korea - undefined

1995

Graduate - undefined

Engineering, Suez Canal university
1990

Skills

  • Training sessions made to electrical team at Arma Academy
  • Environmental protection strategies
  • Qualification and personal skills
  • Organization and Time Management
  • Able to work well under pressure
  • Planning and Coordination
  • Team Builder and good public relation
  • Attention to Detail
  • Interest to work in team work Negotiation and presentation Skills
  • Short and long terms planning, Leadership
  • Helpful, positive attitude, creative, Self-motivated and energetic, Flexible and dynamic
  • Advanced user for windows 10, Microsoft Office, internet, A CAD, SAP, Agility

Languages

English
Fluent
Arabic
Native
French
Elementary

Timeline

Chief Engineering manager

PZ Cussons PLC
04.2015 - 01.2019

Head of Engineering

Iffco Egypt
12.2012 - 03.2015

Group Engineering manager

Arma - HSA
09.2010 - 12.2012

Engineering manager

Honywell
08.2008 - 09.2010

Maintenance manager

Edita Food Industry
08.2003 - 08.2008

Head Of Engineering and Projects - Africa

PZ Cussons - Nigeria
11.1999 - Current

Factory manager

Egypt Sack
08.1997 - 08.2003

Maintenance Section Head

LG Electronics SAE
12.1993 - 08.1997

Maintain and operation site Engineer

Arab contractor
05.1992 - 12.1993

Total Productive maintenance (TPM) -

Failure Mode and Effect Analysis-FMEA - undefined

HACCP - undefined

TPM-Total Preventive Maintenance - undefined

Problem Solving Skill Program Complete Course -Super A, Germany and U.K - undefined

Project Management, Germany - undefined

Quality Management System-Internal Auditor-ISO 9002 - undefined

Innovation of Production System, 5 S Activities, South Korea - undefined

Graduate - undefined

Engineering, Suez Canal university
RASHAD METWALLYHead of Engineering and projects