Summary
Overview
Work history
Education
Skills
REFEREES
Languages
Affiliations
Accomplishments
PROFESSIONAL ENHANCEMENT
Timeline
Generic
Omubo Frederick Inodu

Omubo Frederick Inodu

Port Harcourt,Nigeria

Summary

Accomplished professional with a strong foundation in management efficiency and logistics control, complemented by a deep understanding of project lifecycles. Demonstrates exceptional communication and liaising skills, coupled with decision-making competence and leadership qualifications. Proficient in multitasking, time management, and proactive communication, ensuring seamless project scheduling and adherence to quality standards. Committed to maintaining high stress tolerance capacity while prioritising safety through first aid expertise. Aspires to leverage these skills towards achieving excellence in complex project environments.

Overview

22
22
years of professional experience
3996
3996
years of post-secondary education

Work history

Maritime Operations Coordinator

Saipem Contracting Nigeria Limited
03.2024 - 01.2026
  • NLNG TRAIN 7 PROJECT
  • NLNG Jetty 3
  • New Passengers Terminal Pier
  • MOF Jetty 2 Extension
  • FAB jetty refurbishment works including
  • Dredging of Material offloading facilities and Former aggregate berth shallow water fronts
  • Coordinating with various subcontractors during simops on priority basis
  • Interfacing with engineer disciplines on modifications for civil, mechanical and electrical issues
  • Supervised and executed installation of gangway tower/marine loading arms on loading platform
  • Supervised and executed installation of FAR22/SS44 modules
  • Supervised piling activities on MOF Jetty 2 extension/NLNG Jetty 3 & NPT Pier
  • Supervised installation of longitudinal beams/slabs NLNG jetty 3 trestle
  • Supervised offloading/transfer/fit up/welding and launching of PAR modules
  • Supervised installation of all marine furniture’s MOF jetty 2 extension
  • Supervised and ensured Dredging activities were achieved to required LAT for FAB 7 MOF
  • Ensured deliverables were procured and actualized.
  • Ensuring quality of each task is done with utmost standards and no cutting of corners.
  • Overseeing all onsite and offsite constructions to monitor compliance with construction and safety regulations
  • Ensured required materials and resources are utilized for each activity utilized on site for construction.
  • Accountable for implementation of standard Installation/construction procedures on site
  • Simops is maintained for critical activities ensuring communication with feedback is maintained
  • Concurrent plans are followed as agreed by CTR/SCTR

Construction Manager

Evomec Global Services ltd
09.2020 - 07.2021
  • NLNG IA Plant Access Road
  • Co-ordinating with construction team, activities required to carry out regarding SOW
  • Reviewing project in-depth to schedule deliverables.
  • Ensuring the quality of each task is done with utmost standards and no cutting of corners.
  • Overseeing all onsite and offsite constructions to monitor compliance with construction and safety regulations
  • Provide required materials and resources to be utilized on site for Construction.
  • Accountable for the implementation of standard Installation/construction procedures on site

Project Coordinator

Inodu Energy
07.2019 - 08.2020
  • Bayelsa State Government/Nigeria Agip Oil Company (NAOC) Shore protection Sheet Piles and Jetty Construction Egbemo-Angalabiri Cluster community.
  • Responsible for on time delivery of construction activities.
  • Co-ordinating with the construction team, activities required to carry out (construction & installation activities)
  • Responsible for the overall construction works, including the installation/Testing of the Sheet Piles
  • Provided required materials and resources to be utilized on site for Construction including personnel.
  • Accountable for the implementation of standard Installation/construction procedures at site

Senior Project Manager

First Tricon Ltd
01.2019 - 05.2019
  • Sierra Leone Roads Authority (SLRA) Construction of Bonthe Island Internal Roads/Drainages/Culverts/Cross Drains/Landscaping and Shore Protection (Rubble walls)
  • Responsible for on time delivery of construction activities/materials, interlocking slab equipment base and also control of production of interlocking blocks, logistics control and supply of construction equipment’s, consumables from Keiga mainland to Bonthe Island.
  • Responsible for the overall construction works, including the installation of the Rubble stones as shore protection for the island.
  • Accountable for the implementation of standard Installation/construction procedures at site.
  • Liaised with the Client in order to ensure that the Construction activities are done as agreed upon.
  • Provided required materials and resources to be Utilized on site for Construction including personnel.

Construction Manager

Saipem/Vimivyk Engineering
08.2015 - 12.2018
  • SPDC/SCNL Southern Swamp Associated Gas Solutions (SSAGS) Opukushi Flow Station and Shoreline Protection/Cofferdam Installations & Extractions (Tunu, Ogbotobo, Benisede & Opukushi Flow stations)
  • Responsible for on time delivery of construction activities.
  • Responsible for the overall construction works, including the installation/Testing of the Sheet Piles:
  • Accountable for the implementation of standard installation/construction procedures at site.
  • Liaised with the Client in order to ensure that the construction activities are done as agreed upon.
  • Provided required materials and resources to be utilized on site for Construction including fabrications welding and Installations.
  • Co-ordinated with the construction team, activities required to carry out the Construction & installation activities.
  • Shore line protection (Sheet Pile Jetty/Concrete slope Protection Perimeter Opukushi FS/Stone Pitching Ogbotobo Jetty)
  • Develop Project Execution Plan (PEP),Method statement, work breakdown structures (WBS) and Manpower loading
  • Attended all HSE certificate audits for civil works in Opukushi flow station and HSE certificate audit Sheet Pile works for the four flow stations.
  • Presented and defended constructability approach for sheet pile installations shoreline protection and cofferdam installations/extractions in the flow stations (Tunu, Opukushi, Benisede and Ogbotobo)
  • Responsible for the introduction of cyclopence concrete and grout for the jetty works in Ogbotobo flow station.

QA/QC Coordinator

Alcon Construction
08.2014 - 07.2015
  • NLNG IA Workshop and External Building Project / RA Type 3 Apartment Blocks-Phase 1 Project Bonny
  • Determination of Moisture Content of Aggregates on Daily Basis
  • Checking of Temperature of All Concrete constituents on Daily Basis
  • Adjustment of Specified Concrete Weights on Daily Basis
  • Monitoring of Concrete Mixing Operation at the Batching Plant
  • Checking of Concrete Slump and Temperature at the Batching Plant
  • Issuance of Concrete Delivery Notes to Mixer Truck Drivers
  • Preparing of all Inspection records pertaining to the above-mentioned Inspections
  • Monitoring and Inspecting of Aggregates, Cement and Sharp sand deliveries on site
  • Reports to the QA/QC Manager when Discrepancies are Observed on Site
  • Submit all Inspection Records to the QA/QC Manager for Review and Sign-Off
  • Obtain and acquire knowledge of project documentation and specification requirements, standards and codes as required by the scope of the contract.
  • Ensured that material receiving inspections are carried out

Project Manager

Archmann Construction Nig. Ltd
06.2014 - 08.2014
  • Pan Ocean 4”x 9Km Dual line from Utu-Eremu (Otoris-1) Wellhead to Early Production Facility (EPF) at Owa – Aladimma;
  • Develop Procedure Qualification for PQR and WPS
  • Pre bid Meetings, review and approval of working documents
  • Supervised the Survey and Clearing of the Right of Way (ROW)
  • Develop Project Execution Plan (PEP), Method statement, work breakdown structures (WBS) and Manpower loading
  • Review GA Drawings, Shop Drawings and weld maps
  • Assist in the Generation of Invoices and Estimation
  • Ensured that project is done profitably by strict cost managing tools and equipment protection and supervision of workers to increase productivity
  • Follow up on Fabrication, Progress measurement and reporting to ensure targets are followed and resolve problems were found
  • Follow up with QA/QC for inspection NDT (RT, MPI, DPI, UT) and timely production of NDT reports.
  • Supervised Hydro test Activities
  • Supervised Pre-commissioning and commissioning works
  • Prepared and submitted As Built documentations

Project Supervisor

Archmann Construction Nig. Ltd
05.2014 - 07.2014
  • Addax Nigeria Limited MD ADHI 2IH Well Hook up; ADNH 22 Fabrication/ Installations Akam and Deck Extension /Generator Installation Egbugu with Mechanical System Nig. Ltd
  • Conducting, Inspecting and Monitoring of Welds (root/hot pass/filling and capping)
  • Supervise Welders/Fitters
  • Inspect and check joints fit up for alignment, offset, root face preparation, root cap and beveling
  • Ensured the rigging materials are premobed and complaint for lifting
  • Coordinate with the clients and my team on the platform
  • Participated in ongoing professional training opportunities to stay current on industry best practices.
  • Liaised between clients and teams to ensure clear understanding of goals and expectations.
  • Identified potential risks with proactive planning and risk assessment strategies.
  • Fostered a positive work environment through effective leadership techniques, boosting team morale and productivity.

Project Supervisor

Archmann Construction Limited
11.2013 - 01.2014
  • Chevron Nigeria Limited 8” Emergency Repair Idama Flow Station Abonnema with Anotech Global Co. Nig. Ltd.
  • Conducting, Inspecting and Monitoring of Welds (root/hot pass/filling and capping)
  • Supervise Welders/Fitters
  • Inspect and check joints fit up for alignment, offset, root face preparation, root gap and beveling
  • Coordinating the site

Workshop Supervisor

Gelo Integrated Services Nig Ltd
02.2013 - 11.2013
  • Project: Septa Energy Independent Gas Receiving Facility (IGRF) Piping, Structural Steel Fabrication/Erection and Civil Works
  • Develop Procedure Qualification for PQR and WPS
  • Develop Welders Qualification on 2G,3G,5G and 6G Positioning
  • Develop Project Execution Plan (PEP),Method statement, work breakdown structures (WBS) and Manpower loading
  • Review GA Drawings, Shop Drawings and weld maps
  • Assist in the Generation of Invoices and Estimation
  • Accountability for successful completion of projects
  • Ensured that project is done profitably by strict cost managing tools and equipment protection and supervision of workers to increase productivity
  • Follow up on Fabrication, Progress measurement and reporting to ensure targets are followed and resolve problems were found
  • Follow up with QA/QC for inspection NDT (RT, MPI, DPI, UT) and timely production of NDT reports.

Mechanical Supervisor

Gelo Integrated Services Nig. Ltd
12.2011 - 02.2012
  • Project: Septa Energy/Alcon Construction Petrofac Central Processing Facility (CPF) Uquo Esit Eket Mechanical Piping/Tank Erection
  • Supervise Welders/Fitters
  • Inspect and check joints fit up for alignment, offset, root face preparation, root gap and beveling Conducting, Inspecting and Monitoring of Welds (root/hot pass/filling and capping)
  • Manage internal and external interfaces on the project
  • Follow up on Fabrication, Progress measurement and reporting to ensure targets are followed and resolve problems were found

Project Manager

Gelo Integrated Services Nig. Ltd
06.2011 - 12.2011
  • Project: Universal/Septa Energy 24km 6” x 2 Pipeline Projects Fun Manifold Ibeno – Stub creek Oron
  • Develop Procedure Qualification for PQR and WPS
  • Develop Welders Qualification on 2G,3G,5G and 6G Positioning
  • Develop Project Execution Plan (PEP), Method statement, work breakdown structures (WBS) and Manpower loading
  • Inspect and check joints fit up for alignment, offset, root face preparation, root gap and beveling
  • Conducting, Inspecting and Monitoring of Welds (root/hot pass/filling and capping)
  • Monitor and Inspect all Pigging activities
  • Supervise Welders/Fitters
  • Prepare weekly and Monthly Progress Reports
  • Advice finance department on Invoicing for completed jobs (milestone) on monthly basis
  • Coordinating the site
  • Interfacing between Construction and Engineering

Site Manager

Gelo Integrated Services Nig. Ltd
01.2010 - 04.2011
  • Project: Septa Energy 57km 18” Pipeline Projects Ikot Abasi – Uquo
  • Develop Procedure Qualification for PQR and WPS
  • Develop Welders Qualification on 2G,3G,5G and 6G Positioning
  • Develop Project Execution Plan (PEP), Method statement, Work breakdown structures (WBS) and Manpower loading
  • Inspect and check joints fit up for alignment, offset, root face preparation, root gap and beveling
  • Conducting, Inspecting and Monitoring of Welds (root/hot pass/filling and capping)
  • Monitor and Inspect all Pigging activities
  • Supervise Welders/Fitters
  • Prepared weekly and Monthly Progress Reports
  • Supervised Welders/Fitters
  • Coordinating the site
  • Interfacing between Construction and Engineering

QA/QC Lead

Alcon Nig. Ltd Contracting/Saipem/SPDC Gbaran-Ubie Project.
10.2009 - 01.2010
  • Project: Shell / Alcon Contracting Gbaran Ubie FLB
  • Control of mixes for all the casting of Columns, Floor Slab, Roof Slab with resultant slump and concrete cubes test for the Offices/Accommodation Buildings
  • Preparation of Request for Inspection for SPDC
  • Preparation of Grout/Concrete Pre-Placement and Post-Placement Checklist.
  • Inspection and Assuring of Quarry Approved for Materials supplied for the Project
  • Carried out Compositional Analysis and Marshall Stability Test on the Wearing/Binder Course for the Asphalt used on the Flexible Roads.

QA/QC Lead

Alcon Nig. Ltd Contracting/SPDC in Well 9 Upgrading Project.
09.2009 - 10.2009
  • Project: Shell Well 9 Upgrading/Hook up to Okoloma Gas Plant
  • Preparation of Method Statements and JHA for the Hook up Works
  • Prepared Inspection Request for the Hydrotest and NDT Activities
  • Carried out Inspection of Welds, ensured the beveled end, root gap and electrode used is as specified.
  • Ensured that NDT requirement for every material class in a pack is according to the DEP Specification
  • Prepared inspection request and pre-pour/post pour check sheets for concrete and grout
  • Inspected and supervised the casting/grouting of the pipe supports for the spool
  • Ensured soil test were carried using the core cutter method to effect compaction/stability on all excavated trench for the pipe supports
  • Preparation of Hydro test pack for the spool
  • Documentation and Transmittal of all Documents

(DCC) QA/QC Senior Inspector

Alcon Nig. Ltd Contracting/SPDC in Okoloma Gas Plant Construction Project.
02.2006 - 09.2009
  • Project: Shell Okoloma Gas Plant, Afam. Accomplished the following jobs
  • Control of mixes for all the casting of Columns, Floor Slab, Roof Slab with resultant slump and concrete cubes test of the Switch and Control Room Building
  • Preparation of Request for Inspection for SPDC
  • Analyze and interpret Electrical/Instrumentation, Civil/Structural, Mechanical, Process Engineering Flow Scheme & Process and Instrumentation Drawings.
  • Preparation of Grout/Concrete Pre-Placement and Post-Placement Checklist.
  • Inspection and Assuring of Base compaction Test and Backfill Test on All Foundations, Roads and Pit.
  • Inspecting and Assuring of all Pile Load Test Carried Out on the Piles.
  • Inspecting and assuring of all pile integrity testing carried out on the piles
  • Ensured that all grout, reinforcement, aggregate and cement used for concrete works meet the required SPDC specifications.
  • Supervising the Tensile Stress test for Reinforcements, the Compressive Strength Test (Crushing) for Concrete and Compressive Strength Test for Grouts
  • Develop Procedures & Methods.
  • Monitor and Report work progress.
  • Develop Dossier/work Packs on civil/structural, piping fabrication, erection and mechanical equipment installation.
  • Develop Inspection Test Plans /Records (ITPs/ITRs)
  • Prepare Job Hazards Analysis (JHAs) requirements for civil/structural, piping fabrication and erection as well as mechanical equipment installations in collaboration with the health, safety and environment department.

QA/QC Inspector [Civil]

Alcon Nig. Ltd Contracting/SPDC in Gas Receiving Facility (GRF) Project Afam Rivers State.
07.2005 - 12.2005
  • Control of mixes for the casting of Concrete Slabs, Foundation Types, Columns, Plinths, with Slump Test for each Batch
  • Preparation of Concrete Cubes before each Casting
  • Control of Grouting of the Skids and Vessels

Task Force General Secretary/Personal Assistant to the CDC Chairman, Oyigbo

CDC Oyigbo
01.2004 - 01.2005
  • Preparation of Memos, Statements and Minutes
  • Provide Cover for The Chairman when Absent
  • Mediating and Negotiating on behalf of the Community

Education

Bachelor of Science - Geology

University of Calabar
Calabar

Federal Government College, Ijanikin Lagos
Lagos

First School Leaving Certificate - undefined

Nigerian Navy Primary School

Skills

  • Management efficiency
  • Familiar with quality standards
  • Communication and liaising
  • Project lifecycles understanding
  • Stress tolerance capacity
  • Logistics control
  • Proactive communication
  • Decision-Making competence
  • Leadership qualification
  • Multitasking mastery
  • Time management proficiency
  • First Aid
  • Project scheduling

REFEREES

Available on Request

Languages

English
Native
French
Beginner
Chinese (Mandarin)
Beginner

Affiliations

  • Writing
  • Playing tennis
  • Playing football
  • Swimming

Accomplishments

Supervising Safety Award NLNG Train 7 Project achieving 50MM-Hrs LYI free

PROFESSIONAL ENHANCEMENT

  • STCW Basic Mandatory (2024)
  • HSE Supervision [Level 3] (NISP)
  • Confined Space Operation Safety
  • Safety Permit to Work System Administration [Alcon/SPDC Trained]
  • Fire safety
  • Work at height Safety
  • Goal Zero Safety[SPDC Trained]
  • Unsafe Act and Conditions Auditing [Alcon/SPDC Trained]
  • QMS Certification (IRCA STQM Lead Auditor 2022)
  • PMP Certified
  • PTW Holder Trained (SPDC SSAGS)
  • Primavera P6 Certified

Timeline

Maritime Operations Coordinator

Saipem Contracting Nigeria Limited
03.2024 - 01.2026

Construction Manager

Evomec Global Services ltd
09.2020 - 07.2021

Project Coordinator

Inodu Energy
07.2019 - 08.2020

Senior Project Manager

First Tricon Ltd
01.2019 - 05.2019

Construction Manager

Saipem/Vimivyk Engineering
08.2015 - 12.2018

QA/QC Coordinator

Alcon Construction
08.2014 - 07.2015

Project Manager

Archmann Construction Nig. Ltd
06.2014 - 08.2014

Project Supervisor

Archmann Construction Nig. Ltd
05.2014 - 07.2014

Project Supervisor

Archmann Construction Limited
11.2013 - 01.2014

Workshop Supervisor

Gelo Integrated Services Nig Ltd
02.2013 - 11.2013

Mechanical Supervisor

Gelo Integrated Services Nig. Ltd
12.2011 - 02.2012

Project Manager

Gelo Integrated Services Nig. Ltd
06.2011 - 12.2011

Site Manager

Gelo Integrated Services Nig. Ltd
01.2010 - 04.2011

QA/QC Lead

Alcon Nig. Ltd Contracting/Saipem/SPDC Gbaran-Ubie Project.
10.2009 - 01.2010

QA/QC Lead

Alcon Nig. Ltd Contracting/SPDC in Well 9 Upgrading Project.
09.2009 - 10.2009

(DCC) QA/QC Senior Inspector

Alcon Nig. Ltd Contracting/SPDC in Okoloma Gas Plant Construction Project.
02.2006 - 09.2009

QA/QC Inspector [Civil]

Alcon Nig. Ltd Contracting/SPDC in Gas Receiving Facility (GRF) Project Afam Rivers State.
07.2005 - 12.2005

Task Force General Secretary/Personal Assistant to the CDC Chairman, Oyigbo

CDC Oyigbo
01.2004 - 01.2005

First School Leaving Certificate - undefined

Nigerian Navy Primary School

Bachelor of Science - Geology

University of Calabar

Federal Government College, Ijanikin Lagos
Omubo Frederick Inodu