Instrumentation & Control Supervisor Work Planner
Dover offshore engineering
Bonny Island, Rivers State
01.2020 - Current
Dover offshore Engineering
Partner Staff with Nigeria LNG Bonny Gas Plant
NLNG Plant complex, Bonny Island, River’s state, Nigeria
Tracking schedule compliance, Quality delivering and job close out, and ensuring maintenance backlog is within job timeline
Communicate schedules with partners for readiness.
Preparation of work plan strategies, work orders using CMMS
With vax instrumentation and control experience to create work pack and plan work orders for maintenance executions
Creating work packs of jobs within 90days look ahead maintenance plan (LAMP)
Managing post job debrief / learning from incident forms to improve maintenance planning and execution
Accountability and ownership of job scope and quality delivering / Goal zero commitment
Ensures that instrumentation performance tasks and plant change implementation meet the company and regulatory
HSE requirements.
Carries out job estimation and identifies key factors such as labor, support services, and material requests.
Identifying support services and materials selection by carrying out extensive job scoping.
Ensures that materials are properly bagged, tagged, and kept in staging area
Carrying out planned HSE walk about to ensure plant wide safety compliance
Maintenance assurance related reviews and performed Quality assurance on instruments
Utilize technical directive and manuals in daily maintenance activities
Participated in HSE awareness sessions
Goal zero compliance and commitment.
PROJECT EXECUTED
Train 3 Upgrade/ shut-down maintenance turnaround, work planner/instrument night shift
Execution coordinator on VMS and Yokogawa vortex flow-meter upgrade from Y flow model to
VY series 73pcs
Calibration and loop check
Job planner/job prepares/execution coordinator upgrade / MOC replacement of CL17 Hach
Chlorine analyzers in trains 1, 2 & 3
Work planner/job prepare and execution coordinator emergency safety shower and eye wash upgrade train 1,2,3,4,5,6 and common facility
Project planner/execution coordinator of obsolete analyzer replacement/upgrade plant including common facility and unit 6400
Such as PH analyzer, conductivity analyzer, dissolve oxygen analyzer, and moisture analyzer
Work prepares / job planner of 9-K4701 air Compressor overhaul and 2-K3401
Compressor overhaul
Quality assurance for instrument air compressor overhaul
Work prepares, job planner on replacement and upgrade of minimax fire-fighting system.
GTG 10&11 [formally known as HIMA PLC]
Analyzer job preparation, work pack and work order preparation, material bag and tag [ PH
Analyzer, conductivity, dissolved oxygen, and chlorine analyzer
OEM engagement and vendor, valve upgrade / replacement
Written communication / feedback
Work planner on upgrading obsolete fisher valves and actuators in U4300 & and U4800 with the recommended equivalent
Liquid Handling Unit [LHU] Shutdown/turnaround maintenance and upgrade
Small ball tube campaign coordinator/supervisor and instrument valve Quality control
QC]
Follow up with the OEM on material delivery and material specification
Scope development, analysis, and review
And stakeholder management/alignment with support service engagement
Work order preparation, work pack preparation with the method statement, and feedback preparation
Tools and material readiness
Agile planning system
And job progress monitoring.
SKILL:
Smart plant instrumentation tools Project management, and p6 Agile/effective job planning, CMMS SAP
PACER, excel, job scoping safe system of work
Cost management leadership, written communication
AMADAS System control and process control domain skills
Instrumentation and control Technician team lead
DOVER, , LNG PLANT COMPLEX 9
Rotating equipment maintenance turnaround [compressor Siemens [ AN200 and 3MCL] and gas turbines, [ frame 6&7] auxiliary, bearings, loading gear such as bearing thermocouple, exhaust thermocouple, vibration probe, wheel space thermocouple, voltage gapping, heat detector replacement, Ex inspection check, bleed valve removal [ maintenance and reinstatement] IGV Calibration with GE support, LVDT Calibration
Etc.
Installation, preventive, corrective, and routine maintenance of fire and gas detector systems in turbine compartments such as UV detectors, gas detectors, limit switches, heat detectors
CO2 skids, and damper system
CCC transmitter validation and loop check Frame 6 GE turbine compartment
Routine maintenance of seal oil valve system [ split range]
Rosemont transmitter calibration with Hart-com 475 and Drunk DPI611
Live plant instrumentation and control fire gas / QMI
Such as routine preventive and corrective maintenance of gas chromatography off-line calibration and validation with
AMADAS system< co2 , moisture, and gas chromatography analyzer maintenance/calibration [off-line and on-line] and validation with AMADAS system, flue gas analyzer, opacity analyzer, moisture analyzers conductivity, and ph
Analyzer Gas detector routine maintenance polytron
Dragger, line on sight gas detector routine maintenance spectrex, flame detectors, manual call point, limit switch routine maintenance
Engineering support technician, start up support and commissioning
Process monitoring
Valve stroking with DCS interface command
ON /OFF valve upgrade to conditioning monitory system and control valve upgrade positional upgrade to MD pro and Basic [Flow-serve] and installation of STI positioner on some critical butterfly valves
Field calibration of STI positioner.
Ant-surge valve routine maintenance.
Permit to work system [PTW], and job hazard analysis [JHA] oriented
Carries out safety toolbox talk and last-minute risk assessments.
SKILL:
Fault analysis, routine maintenance, and corrective maintenance.
Process control domain control [PCD]
Team lead, troubleshooting, leadership style, root cause analysis, system engineering support.
CMMS, AMADAS system, and written communication/progress report.
Valve calibration, valve stroking with Hart-com 475 mini amp source.
Tube bending and modifications.
Replacement of faulty instrument in the compressor [Siemens] e.g., vibration probes, bearing thermocouple extension cable, reset of gap voltage (Radial and Axial, key phasor, vibration sensor etc.
Preventive maintenance, troubleshooting, and replacement of faulty devices, such as local indicators, valve accessories (e.g., positioners), air filter regulators, quick exhaust, tubing, and pressure gauges.
Replacement of faulty sight glass.
Routine maintenance and replacement of faulty pressure transmitters, pressure differential transmitters, flow meters, level transmitters, level differential transmitters, and temperature transmitters.
Functional test and preventive maintenance of control valves and shut-down valves.
Interpretation of P&ID and troubleshooting loop diagrams, etc.
Functional test preventive maintenance of seal oil valve (split range) e.g
Pressure control valve (PCV), pressure differential control valve (PDCV), temperature control valve (TCV)
CCC Field transmitter calibration, verification, validation, and configuration with HART protocol.
LIGHT AND HEAVY MOTOR VEHICKE DRIVER at OFFSHORE ENGINEERING & MARKETING LTDLIGHT AND HEAVY MOTOR VEHICKE DRIVER at OFFSHORE ENGINEERING & MARKETING LTD