Summary
Overview
Work History
Skills
Timeline
Generic
Okems Kingsley Kelechi

Okems Kingsley Kelechi

Bonny Island

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills

Overview

6
6
years of professional experience

Work History

Instrumentation & Control Supervisor Work Planner

Dover offshore engineering
Bonny Island, Rivers State
01.2020 - Current

Dover offshore Engineering

Partner Staff with Nigeria LNG Bonny Gas Plant

NLNG Plant complex, Bonny Island, River’s state, Nigeria

  • Tracking schedule compliance, Quality delivering and job close out, and ensuring maintenance backlog is within job timeline
  • Communicate schedules with partners for readiness.
  • Preparation of work plan strategies, work orders using CMMS
  • With vax instrumentation and control experience to create work pack and plan work orders for maintenance executions
  • Creating work packs of jobs within 90days look ahead maintenance plan (LAMP)
  • Managing post job debrief / learning from incident forms to improve maintenance planning and execution
  • Accountability and ownership of job scope and quality delivering / Goal zero commitment
  • Ensures that instrumentation performance tasks and plant change implementation meet the company and regulatory
  • HSE requirements.
  • Carries out job estimation and identifies key factors such as labor, support services, and material requests.
  • Identifying support services and materials selection by carrying out extensive job scoping.
  • Ensures that materials are properly bagged, tagged, and kept in staging area
  • Carrying out planned HSE walk about to ensure plant wide safety compliance
  • Maintenance assurance related reviews and performed Quality assurance on instruments
  • Utilize technical directive and manuals in daily maintenance activities
  • Participated in HSE awareness sessions
  • Goal zero compliance and commitment.
  • PROJECT EXECUTED
  • Train 3 Upgrade/ shut-down maintenance turnaround, work planner/instrument night shift
  • Execution coordinator on VMS and Yokogawa vortex flow-meter upgrade from Y flow model to
  • VY series 73pcs
  • Calibration and loop check
  • Job planner/job prepares/execution coordinator upgrade / MOC replacement of CL17 Hach
  • Chlorine analyzers in trains 1, 2 & 3
  • Work planner/job prepare and execution coordinator emergency safety shower and eye wash upgrade train 1,2,3,4,5,6 and common facility
  • Project planner/execution coordinator of obsolete analyzer replacement/upgrade plant including common facility and unit 6400
  • Such as PH analyzer, conductivity analyzer, dissolve oxygen analyzer, and moisture analyzer
  • Work prepares / job planner of 9-K4701 air Compressor overhaul and 2-K3401
  • Compressor overhaul
  • Quality assurance for instrument air compressor overhaul
  • Work prepares, job planner on replacement and upgrade of minimax fire-fighting system.
  • GTG 10&11 [formally known as HIMA PLC]
  • Analyzer job preparation, work pack and work order preparation, material bag and tag [ PH
  • Analyzer, conductivity, dissolved oxygen, and chlorine analyzer
  • Valve Job scoping, resourcing, and estimation [Valtek valves, Flow-serve valves, fisher valves
  • Masoneilan valves etc
  • OEM engagement and vendor, valve upgrade / replacement
  • Written communication / feedback
  • Work planner on upgrading obsolete fisher valves and actuators in U4300 & and U4800 with the recommended equivalent
  • Liquid Handling Unit [LHU] Shutdown/turnaround maintenance and upgrade
  • Small ball tube campaign coordinator/supervisor and instrument valve Quality control
  • QC]
  • Follow up with the OEM on material delivery and material specification
  • Scope development, analysis, and review
  • And stakeholder management/alignment with support service engagement
  • Work order preparation, work pack preparation with the method statement, and feedback preparation
  • Tools and material readiness
  • Agile planning system
  • And job progress monitoring.
  • SKILL:
  • Smart plant instrumentation tools Project management, and p6 Agile/effective job planning, CMMS SAP
  • PACER, excel, job scoping safe system of work
  • Cost management leadership, written communication
  • AMADAS System control and process control domain skills

Instrumentation and control Technician team lead

  • DOVER, , LNG PLANT COMPLEX 9
  • Rotating equipment maintenance turnaround [compressor Siemens [ AN200 and 3MCL] and gas turbines, [ frame 6&7] auxiliary, bearings, loading gear such as bearing thermocouple, exhaust thermocouple, vibration probe, wheel space thermocouple, voltage gapping, heat detector replacement, Ex inspection check, bleed valve removal [ maintenance and reinstatement] IGV Calibration with GE support, LVDT Calibration
  • Etc.
  • Installation, preventive, corrective, and routine maintenance of fire and gas detector systems in turbine compartments such as UV detectors, gas detectors, limit switches, heat detectors
  • CO2 skids, and damper system
  • CCC transmitter validation and loop check Frame 6 GE turbine compartment
  • Routine maintenance of seal oil valve system [ split range]
  • Rosemont transmitter calibration with Hart-com 475 and Drunk DPI611
  • Live plant instrumentation and control fire gas / QMI
  • Such as routine preventive and corrective maintenance of gas chromatography off-line calibration and validation with
  • AMADAS system< co2 , moisture, and gas chromatography analyzer maintenance/calibration [off-line and on-line] and validation with AMADAS system, flue gas analyzer, opacity analyzer, moisture analyzers conductivity, and ph
  • Analyzer Gas detector routine maintenance polytron
  • Dragger, line on sight gas detector routine maintenance spectrex, flame detectors, manual call point, limit switch routine maintenance
  • Valve maintenance strategy [VMS] Valve overhauling, accessory change out / faulty device replacement
  • Engineering support technician, start up support and commissioning
  • Process monitoring
  • Valve stroking with DCS interface command
  • ON /OFF valve upgrade to conditioning monitory system and control valve upgrade positional upgrade to MD pro and Basic [Flow-serve] and installation of STI positioner on some critical butterfly valves
  • Field calibration of STI positioner.
  • Ant-surge valve routine maintenance.
  • Permit to work system [PTW], and job hazard analysis [JHA] oriented
  • Carries out safety toolbox talk and last-minute risk assessments.

SKILL:

  • Fault analysis, routine maintenance, and corrective maintenance.
  • Process control domain control [PCD]
  • Team lead, troubleshooting, leadership style, root cause analysis, system engineering support.
  • CMMS, AMADAS system, and written communication/progress report.
  • PEFS and ILD interpretation
  • Instrumentation and Control Technician
  • PIVOT-, NIG LTD, LNG PLANT COMPLEX BONNY 8
  • Train 2& 3 shutdown /upgrade maintenance [ valve maintenance strategy] disconnection, maintenance, and reinstatement
  • Valve calibration, valve stroking with Hart-com 475 mini amp source.
  • Tube bending and modifications.
  • Replacement of faulty instrument in the compressor [Siemens] e.g., vibration probes, bearing thermocouple extension cable, reset of gap voltage (Radial and Axial, key phasor, vibration sensor etc.
  • Preventive maintenance, troubleshooting, and replacement of faulty devices, such as local indicators, valve accessories (e.g., positioners), air filter regulators, quick exhaust, tubing, and pressure gauges.
  • Replacement of faulty sight glass.
  • Routine maintenance and replacement of faulty pressure transmitters, pressure differential transmitters, flow meters, level transmitters, level differential transmitters, and temperature transmitters.
  • Functional test and preventive maintenance of control valves and shut-down valves.
  • Interpretation of P&ID and troubleshooting loop diagrams, etc.
  • Functional test preventive maintenance of seal oil valve (split range) e.g
  • Pressure control valve (PCV), pressure differential control valve (PDCV), temperature control valve (TCV)
  • CCC Field transmitter calibration, verification, validation, and configuration with HART protocol.

Instrumentation & Control Specialist

Dover offshore engineering
Bonny Island, Rivers State
01.2019 - 01.2020
  • 10 years of on-site instrumentation and control

LNG Plant complex
  • Bonny Island Rivers State.

Skills

  • Smart plant instrumentation tools
  • Project management
  • P6
  • Agile/effective job planning
  • CMMS SAP
  • PACER
  • Excel
  • Job scoping
  • Safe system of work
  • Cost management
  • Leadership
  • Written communication
  • AMADAS System control
  • Process control domain skills
  • Fault analysis
  • Routine maintenance
  • Corrective maintenance
  • Process control domain control (PCD)
  • Team lead
  • Troubleshooting
  • Leadership style
  • Root cause analysis
  • System engineering support
  • CMMS
  • AMADAS system
  • Written communication/progress report
  • PEFS & ILD interpretation
  • Instrument fire and gas specialist
  • Rotating equipment instrument
  • Calibration and validation of instrument
  • Equipment safety
  • Programmed logic control (PLC)
  • Equipment start-up and commissioning
  • Cisco networking and circuit design
  • DCS
  • Accountability and ownership of a project
  • Analyzer instrument specialist

Timeline

Instrumentation & Control Supervisor Work Planner

Dover offshore engineering
01.2020 - Current

Instrumentation & Control Specialist

Dover offshore engineering
01.2019 - 01.2020

LNG Plant complex
Okems Kingsley Kelechi