A versatile and motivated engineer, with many years of experience in electrical instrumentation, control and protection of electrical power generation and transmission equipment. Proven competency in project management. My passion for excellence and attaining professional distinction pushed me to obtain a degree in engineering and pursue a career in energy sector. My strong innovative experience makes me a perfect candidate for any position in engineering and technology disciplines, where I can apply my knowledge, utilize my skills, and leverage my professional expertise in managing any given project.
This organization is active in energy (Electrical power) generation, it has 2 power plants kainji and Jebba. This plant has a capacity of 760MW. I am reporting to Electrical Maintenance Supervisor. Here are my responsibilities;
My Achievements in this position includes;
· Took part in the commissioning of protection system, excitation system and DCS system of 1G7 (80MVA) generator by General Electric. [2021].
· Team Lead in Annual Maintenance of control system and protection system of 120MW, 100MW and 80MW Generator [2022]
· Project Team Lead in the decommissioning, installation and commissioning of 16/330KV, 145MVA Transformer at kainji Power Plant.[2022]
· Participated in the Factory Acceptance Test on Jebba 103MVA Generator Excitation System In Turgi, Switzerland.[2022]
This organization is active in energy (Electrical power) generation.The plant has a capacity of 578.4MW. I am reporting to Electrical Maintenance Supervisor. I was responsible for following;
Main Achievments
· Permit Holder during annual maintenance of a 103MVA generator at Jebba Hydro Power Plant, where the machine availability, reliability and sustainability were improved. (2017)
· Rehabilitation of control and protection circuitry of 33/11KV transformer for Jebba Power plant quarters.[2017]
· Team Member for the decommissioning and commissioning of 4MVA station service transformer for Jebba power plant station service.[2018]
· Succeeded in the Supervision of the installation of 330KV Circuit Breaker at Jebba Hydro Power Station by Hydro China.
· Representative of MESL in the commissioning of KAM industries ( bilateral customer) metering equipment at Ganmo Transmission Station, Ilorin.[2018]
· Team Member in the load appraisal conducted on KAM industries and KAM Wire to ensure there eligibility for bilateral energy business with Mainstream Energy Solutions Limited.[ 2018]
· Project Team Member for the installation and commissioning of ABB 11KV circuit breakers at Jebba Power plant for the purpose of back feed.[2019]
· Project Team Member in the decommissioning, installation, and commissioning of Automatic voltage regulator for a 103MVA Generator with Marubeni /Hitachi at Jebba hydro power plant.[2016]
· Project Team member in the decommissioning, installation, and commissioning of Digital Governor with Andritz at Jebba Hydro power plant.[2017]
· Generated CMMS Code for the plant equipment for effective maintenance.[2020]
This organization was active in producing vegetable oil. I was reporting to head of Electrical and Instrumentation.
Main Achievements
Took part in the commissioning of control system.
Installation of instrument at various part of the refinery and Tank farm.
This company is thermal power plant, and is active in power generation. I reported to Principal Manager. My responsibilities were;
Main Achievement
Team member for the annual maintenance of GT13 generator.
This company is active in transmission of electrical energy from power plants to consumers. I reported to Principal Manager. My responsibilities were;
Main acheivements
ABB PCM 600
ABB Control builder
TIA Portal
Certified [Electrical Engineer], [Council for Regulation of Engineering in Nigeria - [2017]
Certified [Electrical Engineer], [Council for Regulation of Engineering in Nigeria - [2017]
[Area of certification] Training - [Timeframe]