Summary
Overview
Work history
Education
Skills
Certification
Languages
ADDITIONAL INFORMATION
Timeline
Generic
MANILAL PATELIA

MANILAL PATELIA

GODHRA,INDIA

Summary

MAINTENANCE MANAGER

CORRUGATION AND FLEXO PRINTING (ELECTRICAL AND MECHANICAL)

I'm an accomplished Diploma Electrical Engineer with a background in industrial machine Maintenance.I have Electrical and Mechanical Maintenance experience.
To make the life challenging by constantly learning and applying innovative ideas and skills. So as to achieve new standard of excellence.

Overview

25
25
years of professional experience
4000
4000
years of post-secondary education
1
1
Certification

Work history

MAINTENANCE MANAGER

SPECIALITY PULP AND PAPER LIMITED (CORRUGATED BOX
IJEBU-ODE, NIGERIA
01.2026 - Current
  • Corrugation Machine 2.2M BHS 230 Steady Line Fully automatic.
  • Auto Glue Kitchen Make-AOKE smart tech.
  • Printing Machine Make Dong Fang GD-920 six colour and 4 colour, die cutter with FG-2000
  • Printing Machine Make Dong Fang AD-1228 five colour with die cutter.
  • Printing Machine Make EMBA-245 Ultima Quick Set.
  • Bundling machine Make Transpack model-TP-CIL-13T and TP-702P-59
  • Bundling Machine MOSCA.
  • Boiler Make CEEMA 8 Ton capacity Gas fired.
  • Air compressor Make- Atlas Copco-Model GA45VSA and GA55P
  • Air Dryer- Make Atlas Copco-Model F410a
  • Chiller Make-Prasad GWK cooltech Pvt ltd-Model-WECO 18L.
  • Forklift Make-TOYOTA-Capacity-5 and 3 Ton.
  • Hydraulic Baler Machine Make-Jewel
  • Auto Stitching Machine Make-Insun -Model-ES32
  • Semi-Manual Stitching Machine Make-Legend Pack Co.Model-1800
  • Automatic Modular Conveyor Make-Qingdao Canatech Imp.Model-W3000
  • Sample Cutter Machine Make-AOKE-Model-DCZ702516
  • Exposure Machine Make-KEMO-Model-KM-UVA-LED5260
  • Washer(Stereo Processor) Make-KMF-4AW 1320
  • Plate Dryer Make-KEMO-Model-KM4-5260
  • Digital Flexo Imager-Make-CRON-Model-HDI-1600H
  • Solvent Recycler Make- KEMO-Model-KMRS4-200
  • Automatic Water Based Ink Dispenser Make-Beijing Golden Co.Model-GO-YL-YM-14C
  • Valco Melton Controller MCP4J and OT-120
  • Transformer Make-Recon Power-1500 KVA
  • VCB 800 AMP Make-Coronet Engg
  • ACB 1600 AMP Make- Schneider electric
  • Servo Voltage Stabilizer Make-PVJ Power-Model-6/2022
  • Capacitor bank 200 KVAR.
  • Trouble shooting and installations with programming of VFD Make-ABB, Lenze, Schneider,Acopos and L-Force.
  • Trouble shooting PLC Make-Siemens, lenze, Rexroth,B&R
  • Preparation of Purchase requisition,store inventory,store related Documents.
  • Handling of Man power / Shift Control ,Co-Ordination with all Dept.
  • Developd and implemented operations manuals,policies and procedures and maintenance programmes schedules.
  • Carried out electrical and mechanical fault-finding inspections and repairs per company requirements.
  • Scheduling and overseeing all maintenance and project related work by managing team and organizing routine schedules.
  • Monitored maintenance related activities like machine breakdown,preventive action,corrective action and installations of machines.
  • Initiate and/or maintain a cost-effective preventive maintenance programand Implement quality improvement and cost reduction ideas.
  • Contact and work with vendors and subcontractors to achieve desired results.
  • Able to respond quickly to production issues,planan dmanage ongoing projects,develop the maintenance team,and become a leader and contributor to the safety and success of the plant.
  • Ordering,for ecasting and price negotiation of spare Parts inventory.
  • Effectively and independently handling of Maintenance function withSafety,Quality,Productivity,and Inventory management.
  • Responsible for Maintenance implementation, Spare Parts, maintenance as well as training of operators, reduce operation and maintenance cost,ensure preventive action incase of break down.

MAINTENANCE MANAGER

EAST AFRICAN PACKAGING SOLUTIONS LTD
JINJA, UGANDA
11.2012 - 09.2024
  • JOB RESPONSIBILY:-Below Machine are resolve problems and Maintenance Electrical and Mechanical side.
  • Corrugation Machine1.8M and 1.6M Fiveply,Make Ming- Wei semi-automatic and fully auto Machine.
  • Printing machine make Ming-Wei five and six color doctor blade, folder gluer with Rotary Die cut Machine.
  • Boiler 4 Ton, Model-com block and cocomax Husk fire make Thermax.
  • Boiler 4 Ton, Model-shellmax, F.O fire make Thermax
  • ThermicFluidHeater,HuskfireMakeThermax.
  • Egg Tray Machine, Make Sodal Tech.
  • Air Compressor (Rotary and screw) Make Ingersoll Rand.
  • ETP Plant, Make Aqua Unique.
  • Forkliftmake–CAT,cap-3 and 6 ton.
  • 1000KVA D.G set maintenance.Make Cummins.
  • 1000 KVA of Transformer.
  • Maintenance of switch gears.
  • Maintenance of PCC,MCC,ACB Panels.
  • Maintenance of Breaker1600A ACB,make–MerlinGerin.
  • Troubleshooting and installation with programming of VFD, make Control Techniques,ABB,Mitsubishi, Fuji electrical,and Schneider electric.
  • Troubleshooting of PLC make FATEK and SIEMENS.
  • Troubleshooting of HMI,Make HITECH.
  • APFC bank 200 KVA maintenance.
  • Maintenance of Pneumatic and Hydraulics control system.
  • Trouble shooting and programming for VALCO Glue system MCP -4F with valve- 900.
  • Maintenance of Stitching,Gluing and Hydraulics Balling M/C.
  • An ISO 9001:2015 (Quality management system), ISO 45001:2018 (Occupational health and safety management systems) and 22000:2018 (Food safety management systems) Certified companies engaged in manufacturing of corrugated boxes, trays and pulp molded egg trays.
  • Preparation of Purchase requisition,store inventory,store related Documents.
  • Handling of Man power / Shift Control ,Co-Ordination with all Dept.
  • Capabilities to have replacing new corrugater rollers with pressure roller in 8 hrs.
  • Developed and implemented operations manuals,policies and procedures and maintenance programmes schedules.
  • Carried out electrical and mechanical fault-finding inspections and repairs per company requirements.
  • Reporting to General Manager.
  • Scheduling and overseeing all maintenance and project related work by managing team and organizing routine schedules.
  • Monitored maintenance related activities like machine breakdown,preventive action,corrective action and installations of machines.
  • Initiate and/or maintain a cost-effective preventive maintenance programand Implement quality improvement and cost reduction ideas.
  • Contact and work with vendors and subcontractors to achieve desired results.
  • Able to respond quickly to production issues,planan damanage ongoing projects,develop the maintenance team,and become a leader and contributor to the safety and success of the plant.
  • Ordering,for ecasting and price negotiation of spare Parts inventory.
  • Effectively and independently handling of Maintenance function withSafety,Quality,Productivity,and Inventory management.
  • Responsible for Maintenance implementation, Spare Parts, maintenance as well as training of operators, reduce operation and maintenance cost,ensure preventive action incase of break down.

MAINTENANCE ENGINEER

POLY KRAFT (GH) LTD
TEMA
06.2010 - 10.2012
  • JOB RESPONSIBILY:-Below Machine are resolve problem and Maintenance Electrical and Mechanical side.
  • Corrugation Machine FivePly MakeTCY1.8M and LMC2.2M Fully Automatic Machine.
  • Printing machine makeTCY and LMC four color with rotary die cut and folder gluer.
  • Boiler make Chochran,Thermax,4 Ton capacity.
  • Screw Airopresser make–Atlas copco and Elgi.
  • 1000 KVA and 500 KVA Transformer.
  • 500KVA and 275 KVA D.G Set.
  • HT/LT switch gears.
  • Maintenance of PCC ,MCC ,ACB Panels.
  • Preventive maintenance of Breaker 1600A ACB,make–GEC.
  • Trouble shooting of VFD make Control Techniques,Bentone.
  • Trouble shooting of PLC make Allen-Bradley.
  • Maintenance of Pneumatic and Hydraulics control system.
  • Forklift make – linde Germany cap-6 Ton.
  • Maintenance of Stitching M/C, Gluing M/C, MakeTCY and hydraulics belling machine.
  • Preparation of Purchase requisition, store inventory, store related Documents.
  • Handling of Man power / Shift Control ,Co- Ordination with all Dept.
  • Carried out electrical and mechanical fault-finding inspections and repairs per company requirements.
  • PROJECT WORK
  • Installations of fully automatic Printing machine six color with doctor blade, and with Folder gluer, Installations of 1.8M corrugation machine,make,Ming-Wei,EggTray Machine Make Sodal Tech and Thermic Fluid Heater Make Thermax and ETP Plant. Also refurbishment old printing machine 4- color with slotter unit, model-CPS-1, year-2008

MAINTENANCE ENGINEER

J.S CORRU PACK PVT LTD
VADODARA
08.2009 - 06.2010
  • JOB RESPONSIBILY:-Below Machine are resolve problems and Maintenance Electrical and Mechanical side.
  • Corrugation automatic machine make Natraj India,Printing machine,gluing machine,Stitching machine,Strapping M/C, Balling M/C, Buffer cutting M/C, Hot Gluing M/C.
  • Maintenance of PCC,MCC,A.C&D.C Motors and VFD.
  • Maintenance of Thermic Fluid Heater Make Thermax. Air compressor Make Toyo
  • PROJECT WORK
  • Installations of 1000 KVA Transformer HT/LTS witch Gear,PCC,MCC -APFC Panel and Plant lighting.
  • Installations of Elgi screw compressor,air dryer,air receiver tank and air pipe fittings.
  • Installation of Thermax make boiler and steam pipes and fittings.
  • Installations of fully automatic Corrugation machine five ply 2.2M, Make LMC Machine.

SERVICE ENGINEER

RAJNI ENGINEERS & SERVICE PVT. LTD
VADODARA
01.2009 - 08.2009
  • JOB RESPONSIBILY:-Below Machine are resolve problems and Maintenance Electrical and Mechanical side.
  • Weishaupt & Benton make Boiler &oven burner Maintenance and Installation.
  • VFD Make Denfos, & ABB Installation and Trouble shooting.

SERVICE ENGINEER

NON STOP UTILITY SERVICES
VADODARA
06.2008 - 07.2009
  • JOB RESPONSIBILY:-Below Machine are resolve problem and Maintenance Electrical and Mechanical side
  • Gas,Oil and Coal fired Boile rInstallation and Maintenance Electrical and Mechanical,Make-Thermax.

ELECTRICAL ENGINEER

SABERO ORGANICS GUJARAT LTD
SARIGAM G.I.D.C VAPI
07.2005 - 06.2008
  • JOB RESPONSIBILY:-Below Machine are resolve problems in Electrical.
  • Maintenance of HT/LT switch gears &Transformer.
  • Maintenance of PCC,MCC,VCB,CCB Panels.
  • Preventive maintenance of Motors & control Panels.
  • Preventive maintenance of Breaker 1600A/3200A ACB, make –GEC
  • Maintenance & Operation of DG set 1000KVA & 500KVA with Synchronization system.
  • Preparation of Purchase requisition,store inventory,ISO related Documents.
  • Handling of Man power / Shift Control, Co-Ordination with all Dept.

ELECTRICAL ENGINEER

GAYATRI MINERALS & CHEMICALS
HALOL
07.2002 - 06.2005
  • JOB RESPONSIBILY:-Below Machine are resolve problems in Electrical Maintenance.
  • 500KVATransformermaintenance.
  • Maintenance of PCC & MCC.

ELECTRICAL ENGINEER

GARIMA ELECTRICAL INDUSTRIAL SERVICE
HALOL
07.2001 - 05.2002
  • JOB RESPONSIBILY:-ELECTRICALPROJECT
  • Installation of PCC,MCC,Cable laying and Cable Gland Termination.

Education

H.S.C -

U.H.BHATT HIGH SCHOOL
MUNPUR, MAHISAGAR, IND

S.S.C - undefined

U.H.BHATT HIGH SCHOOL
MUNPUR, MAHISAGAR, IND

Diploma - Electrical Engineering

K.D.POLYTECHNIC
PATAN, GUJARAT, IND

Skills

  • Capable of providing leader ship, supervision and controlling of a factory floor
  • Plant Maintenance and Troubleshooting Electrical and Mechanical both side
  • A hardworking, honest and confident personality blended with a strong work
  • Electrical control circuit Design and Panel board wiring
  • Knowledge in HT and LT power distribution
  • Knowledge in different types of VFD,PLC,HMI and SCADA machine trouble shooting
  • Project Handling and co-ordination with manufacture
  • Plan for critical spare parts and follow-ups
  • In charge of engineering stores
  • Implementing maintenance schedules and carrying out periodic checkup performance of various equipment's and maintaining requisite documents for the same
  • Allocating work to a team and organizing routine schedules
  • Hands on experience on various equipment's/machines Used in printing and packaging industry
  • Carrying out quality inspections and responding immediately to equipment breakdowns
  • To carry out suitable modification/development/innovations in machines and processes for better quality & productivity
  • To ensure suitable maintenance of equipment's for continuing process capability and plans to lower downtime
  • Checking and calibrating instruments to make sure they are accurate
  • Identifying and fixing faults or arranging for replacements to be installed

Certification

  • SOFCON INDIA PVT LTD, VADODARA,INDIA
  • PLC(Programmable Logic Controller)-Acquire knowledgeon ladder logics PLC programming, worked on Siemens S7 200, 400 1200, Allen-Bradley Micrologix 1000-1200, SLC-503and AB PLC, Worked on Sematic manager and basic of TIA. Learn communication protocol between PLC, VFD and HMI.
  • SCADA-Wonderware(In touch), RS View 32 Applications and Development. HMI-Learn basic knowledge of programming and interfacing between HMI and PLC.
  • VFD -Learn installation of Delta,ABB,Siemens,VFDand its working process. Acquired Knowledge onVFD parameters and troubleshooting.
  • PROCESS INSTRUMENTATION-RTDS, Thermo couples,Level Sensor, Flow sensor, Proximity Sensors, Relays, Contactors, Thermal overload relays.
  • MOTORS/STARTERS/CONTROL CIRCUITS-Induction Motors, Torque/ Speed characteristics, Star Delta Starters, DOL Starters, reversing starters, interlocking circuits and panel Wiring.

Languages

English
Fluent

ADDITIONAL INFORMATION

  • Date of Birth: 06-FEB-1977
  • Marital Status: Married
  • Current location: INDIA
  • Religion: Hindu
  • Nationality: Indian

Timeline

MAINTENANCE MANAGER

SPECIALITY PULP AND PAPER LIMITED (CORRUGATED BOX
01.2026 - Current

MAINTENANCE MANAGER

EAST AFRICAN PACKAGING SOLUTIONS LTD
11.2012 - 09.2024

MAINTENANCE ENGINEER

POLY KRAFT (GH) LTD
06.2010 - 10.2012

MAINTENANCE ENGINEER

J.S CORRU PACK PVT LTD
08.2009 - 06.2010

SERVICE ENGINEER

RAJNI ENGINEERS & SERVICE PVT. LTD
01.2009 - 08.2009

SERVICE ENGINEER

NON STOP UTILITY SERVICES
06.2008 - 07.2009

ELECTRICAL ENGINEER

SABERO ORGANICS GUJARAT LTD
07.2005 - 06.2008

ELECTRICAL ENGINEER

GAYATRI MINERALS & CHEMICALS
07.2002 - 06.2005

ELECTRICAL ENGINEER

GARIMA ELECTRICAL INDUSTRIAL SERVICE
07.2001 - 05.2002

S.S.C - undefined

U.H.BHATT HIGH SCHOOL

H.S.C -

U.H.BHATT HIGH SCHOOL

Diploma - Electrical Engineering

K.D.POLYTECHNIC
MANILAL PATELIA