Summary
Overview
Work History
Education
Skills
Education Details
Salary
Application
Software
Accomplishments
Timeline
Generic

Jawaharlal Nadar

EPC Project Manager
Mumbai

Summary

Multilingual Project Leader, Proficiency in executing mega size industrial projects from concept to commissioning, experienced in Project management, Cross function activities, cost control, schedule control and conflict management.

Dedicated professional with a history of meeting company goals (execution within budget and time) utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational value.

Having wide experience in the following Oil & Gas, Industrial gas plants Project Management (Concept to Commissioning).

• Air separation plants, executed 5x5250 tpd

• Natural gas processing plants, Crude oil flow station, cross country pipelines

• Cryogenic liquid storage and handling system

• Poly propylene storage and handling system

• Steam super heater package

• Adsorption plants, Utility packages (IA/PA/N2/Cooling tower, Fire & Safety system)

• Furnaces, fired heaters, incinerators, Flare system,

• Burner management system

Overview

36
36
years of professional experience
3
3
Languages

Work History

General Manager Projects

Sterling Petrochemicals And Fertilizers Ltd.
1 2024 - Current

Project Management and Control in Oil & Gas Projects, Petrochemical projects i.e., Gas Processing Plant, C2,C3, C4, C5+ storage system, LPG handling system, crude oil flow station projects, LNG and Petchem projects (Ethane cracker, PE, PDH and PP).


Key roles are, supporting / coordinating for management in the following roles,

  • Base schedule agreement with all stake holders,
  • Progress monitoring and schedule control.
  • Cost estimation, developing the budget, Budget control
  • Risk analysis, delay analysis and mitigation plan, Critical path analysis regularly.
  • Monitoring progress, MIS review with management
  • Standardization of packages, design concept
  • Change management control
  • EHS policy implementation
  • Cross function management
  • Value addition and cost optimization
  • Resources management (machinery, raw materials, man power)
  • Project execution methodology

Asst. Vice President - RPMG

Reliance Industries Ltd.
1 2008 - 7 2019

Gasification project - executed 5x5250 tpd ASU projects and packages Steam super heater, Aux boiler, Cooling water system, Utility systems, Balance of plant and system

Cryogenic liquid storage and handling system.


Key roles and responsibilities


Developing project concept & design basis, project execution plan

Project Execution, implementing FAST TRACK execution methodologies in EPC.


SCHEDULE, BUDGET

  • Project baseline schedule preparation, L3/L4 level schedule preparation as per inputs received from designers, vendors, stake holders, project leads.
  • Schedule controlling & monitoring, catch up plan.
  • Budget preparation, base line cost, implementing value additions, +/- 10% cost accuracy and management approval.
  • Preparing cash flow sheet and alignment with F&A.
  • Identifying cost over runs and Implementing cost control measures.
  • Establishing change management procedure. Controlling PDNs.


ENGINEERING:

  • Alignment/agreement with vendors for applicable design standards, codes, basic design basis.
  • Process and U&O Integration, during design conceptualization,
  • Preparing DOR for engg scope, supply and construction.
  • Managing engg team, fast track engg execution, monitoring engg progress and deliverable schedule
  • Implementing value addition in engg.
  • Coordinate with procurement to get vendor inputs in time to avoid engg delay.
  • Monitoring document management, resolving loading/download issues, ensuring access to only right users, red marking progress, revision control etc.,


PROCUREMENT:

  • Preparing MR for getting offers, preparing techno commercial evaluation, vendor/contractor selection for process plant and packages along with commercial team.
  • Publishing approved vendors list, additional new vendors management
  • Coordination with commercial team for PO release, inspection, delivery, payment, packing.
  • Coordination with logistic team for shipping and delivery
  • Prime contract management, Coordination with legal team for NDA matter, contractual issues
  • Monitoring material receipt and MRR documentation.


PROJECT EXECUTION:

  • Charting staffing plan, resources requirement at various phases of project
  • Charting risks and working out risk mitigation plan, Assessing the impact of risk in project cost & schedule, determining contingency plan to overcome risks.
  • Identifying critical path and milestones, taking action to overcome critical path.
  • Providing leadership in building one team and result oriented culture, developing committed team to meet project objectives.
  • Managing Cross-functional activities
  • MIS review with top management
  • Maintaining high performance in HSE requirements as per industry norms and standards, procedures, specifications.
  • Effectively managing regulatory agencies, government authorities to get approvals from time to time.
  • Establishing effective communication and reporting procedures.


  • Managing construction team - supporting team for men and materials, implementation of safe work practices, resource requirement, vendor support.
  • Coordination - Coordinated with all concerned site managers/leads for mechanical completion of individual package, integration of completion and start-up activities of various packages with respect to commissioning sequence including regulatory approval management.

Plant Manager

INOX Air Products
05.2004 - 06.2007

Commissioned and Operated 1x300 tpd, and 1x885 tpd ASU plants for 3 years successfully.


  • Executed various trouble shooting measures and achieved 100% production as per design case and 99% availability of plant.
  • Formulated spares management strategy and arranged spares to support plant operation.
  • Achieved monthly target liquid production and supported supply of liquids to customers without interruption. Orchestrated long-range planning for operations, enrollment and customer service.
  • Monitoring healthiness of plant and machinery.


  • Arranged scheduled mockup drills to ensure working condition of plant safety measures
  • Conceived, developed and implemented an aggressive expansion project that quadrupled the size of the facility and staff, as well as added an additional grade level.
  • Formulated and implemented safe plant O&M Policies, Procedures and Manuals
  • Improvement packs are added and achieved full liquid production.
  • Trained new employees, improved their confidence level in operating plant and system.
  • Implemented HSE practices as per policy.

Manager— ASU (Plant Operation)

JSW Ltd.
01.1998 - 01.2004

Executed 150-tpd Air separation plant, Oxygen Gas PRDs system, GOX/GAN storage and distribution network, Liquid storage system, Utility packages and system from concept to commissioning.

  • Coordinated with various units, tracked critical path, executed project plans, implemented corrective measures, mitigated risks to meet goal of "timely completion" of project.
  • Managed contracts in all phases, from pre-award to completion,
  • Ordered equipment/materials, negotiated subcontracts, sourced work force, created schedules, negotiated change orders, including closed out of projects.
  • Coordinated and managed multiple vendors,
  • Ensuring quality assurance, and compliance to all safety, environmental standards and govt regulations.
  • Led the entire Team by providing overall robust Leadership for capital projects in a most efficient, effective manner including cost control/ cost effective measures.
  • Completed all project deliverables/activities in time within budget, and acceptable quality.

Served as a service manager to support O&M team.

Flourished as Oxygen plant Asset Manager

  • Developed and implemented operation Policies, Procedures and various HSE programs to enhance plant safety (of men and machinery), including confined space training program.
  • Implemented various plant performance improvement related projects; upgraded the plant systems.
  • Functioned as RCA and improvement manager for trouble shootings, enhancement of production and quality of products.

Project site Engineer - ASU (Projects)

L&T
01.1995 - 01.1997

Executed 300-tpd Air separation plant, Oxygen Gas PRDs system, GOX/GAN storage and distribution network, Liquid storage and b/u system, Utility packages (IA/PA/N2/Cooling tower, Fire & Safety system from concept to commissioning.


Polypropylene terminal facility in AIL Hazlra complex, and 300 tpd ASU in Birla Copper, Dahej.


  • Handled Project Site management, Responsible for projects mechanical piping activites from construction to pre-commissioning, followed by commissioning, performance testing and de-bottle necking etc.,
  • Actively involved In project planning, recourses management, mitigation of hurdles at site execution, heavy lifting etc., Overviewed civil, mechanical, piping, Electric and instrumentation construction jobs, fire protection systems etc., in terms of quality and schedule commitment.
  • Coordination with different agencies, client, licensor, consultants to implement the site activities as per target schedule till mechanical completion.
  • Supported O&M team and licensor for successful commissioning of plant.
  • Formulated established QCP, implemented QA/QC requirements, organized resources to perform QA/QC, coordinated with various agency/contractor to execute QA/QC programs.
  • Fulfilled various safety norms as required to meet Zero Incident at site.

Site Engineer - Flares, Burner systems

Airoil Flare gas India
01.1989 - 01.1995

Executed Furnaces, fired heaters, incinerators, Flare system construction activities for various clients. Handled 12 flare system project sites, 2 Burner management system project sites.


  • Organized site job with various contractors, finalized contract documentation, made agreement with contractors.
  • Coordinated with contractors, head quarter, client and various agency for smooth execution of site jobs.
  • Executed site job as per project schedule and management objective.
  • Achieved major milestones, like installation of 80 mtr self supported flare stack.
  • Handled testing, commissioning, performance testing and de-bottle necking of Flare system and Combustion system
  • Worked closely with Project Managers regarding constructability issues, cost variations, and time overrun.

Site Engineer

Dowel Erectors
01.1988 - 01.1989

Executed construction activities in 210 MW thermal power plant from civil work to mechanical completion.

Education

Bachelor of Engineering -

Thiagarajar College of Engineering
Madurai
04.2001 -

Skills

  • Process knowledge
  • Change management
  • Cost control
  • Ownership
  • Value engineering
  • Schedule control
  • Contract management
  • Team leader
  • Risk management

Education Details

Qualified Mechanical engineering with expertise in Refrigeration and air conditioning. Graduate from Thiagarajar College of Engineering, Madurai

Salary

5500 USD net salary + 1000 USD allowances per month, tax free salary.

Application

EPC Project Management (Leader level) from concept to commissioning

Software

MS Project, PPT

Accomplishments

Award received for Fast track RFQ documentation for ASU package

Award received for 10 years service award by RIL management

Timeline

Plant Manager

INOX Air Products
05.2004 - 06.2007

Bachelor of Engineering -

Thiagarajar College of Engineering
04.2001 -

Manager— ASU (Plant Operation)

JSW Ltd.
01.1998 - 01.2004

Project site Engineer - ASU (Projects)

L&T
01.1995 - 01.1997

Site Engineer - Flares, Burner systems

Airoil Flare gas India
01.1989 - 01.1995

Site Engineer

Dowel Erectors
01.1988 - 01.1989

General Manager Projects

Sterling Petrochemicals And Fertilizers Ltd.
1 2024 - Current

Asst. Vice President - RPMG

Reliance Industries Ltd.
1 2008 - 7 2019
Jawaharlal NadarEPC Project Manager