A dedicated Analyst with over Nine (9) years of experience and a solid background in enterprise level solutions specifically infrastructure design, virtualization, backup and recovery, and Cloud and DevOps Technologies. Executed over 14 projects across 5 business industries in three countries. Proficient in Microsoft Azure -IAAS, Hyper-V, VMware, Linux, Monitoring, IT Disaster Recovery, Service Management Reporting and Documentation.
FMDQ GROUP
Role: Team Lead
Description: Domain Migration from fmdqotc.com to fmdqgroup.com
Setup and configuration of Active Directory, DNS
Setup of Veritas backup solution, Solarwind Monitoring solution
Pilot provisioning of containerised app docker, and automating server deployment using Ansible
ECOWAS Abuja
Role: Team Lead
Description: Migration to Azure Cloud Services
Analysis of ECOWAS infrastructure for cloud readiness.
SAP module (BI/BW) migration to Microsoft Azure cloud.
IAAS provisioning for cloud workloads.
S2S VPN connectivity between ECOWAS Nigeria and all other annexes.
Configuration of VPN setup between Azure and Ecowas on premise network.
STERLING bank Headquarters
Role: Team Lead
Description: Hyper-V Stretch cluster configuration between production and DR sites.
Geo distributed CSV leveraging Dell VPLEX metro
BCP Morocco
Role: Team Lead
Description
Setup and configuration of Dell XC730xd, configuration and installation of
Setup and configuration of VMware ESXi and vCenter with vSphere operations manager, installation and configuration of Nutanix hyper converged infrastructure.
Volta River Authority Ghana
Role: Team Member
Description: Server Upgrade and Patching
Dell Compellent memory upgrade, Dell FS8600 installation and configuration using enterprise manager solution.
First Bank of Nigeria
Role: Team Member
Memory Upgrade of First Bank's Virtual Server Environment running on about 20 servers
Skye Bank Nigeria
Role: Team Member
Description: Infrastructure Refresh
Configuration of Microsoft Hyper-V and Failover Cluster Roles on Active directory
Compellent SC8000 Controllers with 2 SC200 Enclosures and 1 SC220 add-on Enclosure
2 Brocade 6510 FC Switches setup