Summary
Overview
Work History
Education
Skills
Affiliations
Certification
Interests
TRAININGS ATTENDED
SCRABBLE, CHESS, TABLE TENNIS
Timeline
Generic
ELEMCHUKWU NOSIKE HENRY

ELEMCHUKWU NOSIKE HENRY

PROJECT ENGINEER, CERTIFIED PMP #4400747
OMOKU,RIVERS STATE

Summary

With an Engineering Aptitude in Oil & Gas Systems and Professional Experience in Engineering, Construction, Installations, & Inspections. Trained in quality Management System, NDE-ASNT level II (PT, MT, UT, RT, RFI & VT) Certified Quality Controller (AWS-CQC) and Certified in A-NDT TOFD & PAUT, Certified Welding Inspector (AWS-CWI:15114351), Certified Project Management Professional by Project Management Institute (PMP #4400747)

Overview

8
8
Certificates
15
15
years of professional experience

Work History

PROJECT ENGINEER

HERITAGE ENERGY OPERATIONAL SERVICES LIMITED (HEOSL) OML30
11.2024 - Current
  • Coordinate Kick Off Meetings (KOM) with contractors for various projects.
  • Supervise OML30 pipeline projects at Area A/B at Olomoro/Oleh, Oweh, Uzere, Afiesere, and Kokori etc.
  • Supervised Olomoro 4” Flow-line and 2” Gas Lift Line, modification of flow-lines for optimal production from start to finish.
  • Review contractor’s documents; Method statement, Flushing plan, hydro-test procedure, Isolation plan, JSA etc
  • Supervise wellhead flow line and Gas Lift Line modification and re-routing project scopes whereby isolation, depressurization, flushing, and hydro-testing activities are conducted safely with zero incidence and fatality.
  • Ensure safety compliance on site by ensuring: START WORK CHECKS (SWC), SAVE YOUR LIFE ACTION (SYLA) & STOP WORK AUTHORITY (SWA) are applied as save guards in ensuring safety on work site.
  • Report daily activities to Const. Superintendent/Project Manager.
  • Review materials and ensure compliance with HEOSL specifications.

CONSTRUCTION CO-ORDINATOR. (PIPING/STRUCTURAL/QAQC)

CHEVRON NIGERIA LIMITED (CNL)
05.2020 - 10.2024
  • Responsible for all construction activities within Chevron South Swamp Locations; Makaraba Flow station, Utonana Flow station, Abiteye Flow station.
  • Sectional replacement of 16” MUA Pipelines, River crossing.
  • Very kin to Safety processes and procedures.
  • Organize/attends daily work briefing and updates project timeline and schedules.
  • Ensures START WORK CHECKS (SWC), SAVE YOUR LIFE ACTION (SYLA) & STOP WORK AUTHORITY (SWA) are applied as save guards in ensuring safety on work site.
  • Participate in RISK ASSESSMENT prior to commencement of every project.
  • Participates in Personnel Planning Hazard Phase Analysis (PPHA) prior to any project or work startup.
  • Review drawings related to all fabrication activities in line with Chevron Engineering Standard (CES).
  • Ensure QAQC of materials are maintained, before during and after fabrication material handling.
  • Responsible for the close out of all generated Vision Work Requests (VWR) with QCP documentation as per Mechanical Integrity scope and recommendation.
  • Coordination of PIPELINE REPAIRS; Sectional replacement of failed pipeline section due to mechanical failure and third-party interference in line with API 1104 & CES.
  • Prepares NDT requests as required in CES; RT, UT, MPI, DPI or PAUT
  • Proper material selection as per drawings are maintained and followed to the later.
  • Review procedures associated with Construction scope.
  • Ensure compliance of all job scopes in-line with CNL procedures; Const. Procedure 20, & 60
  • Interphase with Construction Engrs and Superintendents regarding project schedules and completion timeline.
  • Responsible for work force coordination, planning and work execution.
  • Ensure work force compliance to safety in all jobs/projects.
  • Review material requisition for construction fabrication.
  • Review Hydrotest procedures.
  • Follow up and Inspect Welding activity related to the EESP on the Contractor yard and send daily report to my manager.
  • Inspection and follow-up with the fabrication of Pig Launcher Skid for EESP
  • Inspection and follow-up fabrication of Pig Launcher/ Receiver for the EESP.
  • Follow up Fabrication activity of MOV/PSV Access platforms with contractor
  • Follow up Fabrication activity of Platform.
  • Review procedures related to the job.
  • Coordinate PQT for and review PQR reports for EESP.
  • Coordinate and Supervise WQT; for 6GR-6”& 8” (Sch 60 and Sch 40 pipe) and 6G-6” (sch40) pipes and 3G.
  • Witness Mechanical Testing at PTI lab for all Test pieces ensuring that CNL specification is maintained.
  • Review RT films and other NDT Activities; MPI, DPI for MOV Access platform structures for Offshore Installations and PAUT; for pipe welds.
  • Follow up coating activity for EESP 30” Pipes.
  • Inspect all material related to the EESP job before, during and after welding.
  • Follow-up with daily Inspections on site with regards to dimensional checks, Weld visual, Fit-ups before, during, after activity ensuring quality is maintained with respect to CNL specs.
  • Follow up Cube crushing tests for 7days,14days, 21days and 28days for the Pig launcher sump pit concrete work.

QAQC WELDING INSPECTOR (STRUCTURAL/PIPING)

CHEVRON NIGERIA LIMITED (CNL)
03.2018 - 04.2020
  • Coordinate PQT for Single Point Mooring (SPM) for the EESP PROJECT
  • Coordinate WQT for SPM for the EESP
  • Witness the Mechanical Testing at PTI lab for all test pieces ensuring that CNL specs is maintained.
  • Review procedures, NDT activity.
  • Follow-up with daily Inspections on site with regards to dimensional checks, Weld visual, Fit-ups before, during, after activity ensuring quality is maintained with respect to CNL specs.
  • Inspect all materials relating to the SPM.
  • Coordinate and Supervise WQT; for 6GR-6”& 8” (Sch 60 and Sch 40 pipe) and 6G-6” (sch40) pipes and 3G.
  • Follow up with fabrication of FSO piping; Material reconciliation.
  • Flange Management and Inspections.
  • Review documentations in line with ITP
  • Witness Hydro-testing of related piping spools.
  • Follow up with painting and coating activities.
  • Follow up with Bolt Torque exercise in other to ensure zero leak.

QAQC COORDINATOR: (PIPING/STRUCTURAL)

IRON OX NIGERIA LIMITED
01.2018 - 03.2018
  • Coordinate all activities related to quality on site.
  • Follow-up all issues related to inspections and resolve with client
  • Review RT films and resolve repairs issues.
  • Review procedures, drawings and RT reports

QAQC ENGR.: (Piping/Tank/Structural & Equipment)

ONSHORE CONSTRUCTION LIBERAL LIMITED COMPANY (OCLLC)
07.2016 - 06.2017
  • Coordinator, AGP (Above Ground Piping) and all welding related activities on site: Piping, Equipment (s), and Structure. Strictly adhering to ITPs, and Method Statements Procedures, in other to ensure that quality is maintained. Very familiar with, Codes and standards; ASME B31.3& ASME 31.1, ASME Section IX, ASME Section V
  • Proficient in documentation of daily inspection report of the day-to-day site activities and also relating and resolving site related issues to the appropriate authority.
  • Responsible for the welding activities on AGP (Above Ground Piping): PR 400, PR300, PR302, PR303 &cooling tower. Coordinate fit up inspections, pipe alignments, orientation, weld visual inspections and prepare reports of daily inspection activities to be signed off by clients.
  • Ensuring the right filler wires are used for the cryogenic lines on PR 400 and S-23 Locations; AG &AL [Ammonia Gas &Ammonia Liquid] LTCS (E7018-1& E7R05-6) lines.
  • Supervise welding of Cold Collection Assembly in the primary reformer units which also extends to the secondary reformer units.
  • Follow up and coordinate, fit-ups, alignments prior to welding activities on equipment (s): such STG (Steam Turbine Generator) Exhaust duct welding, expansion joint welding of condenser, before, during, and after welding, perform visual inspections reports, and sign of all reports as relates to the activities.
  • Responsible for the welding and coordination of the granular dust scrubber in the granulation area close to the Ammonia tank. Checking, fit-ups, alignment, orientation, as per drawing requirements ensuring to that quality is maintained to the later with respect to the approved standards; WPS be maintained.
  • Responsible for the welding of re-claimer Portal Assembly (bulk storage) Structure, checking alignments of plates, fit-ups root gaps as stated in the drawing and also selection of the right consumables for the stipulated activities, ensuring the right WPS, is used in other to ensure quality.
  • Coordinate and supervise welding of waste heat boiler piping, P11 material, and supervising all the activities concerned, fit up, welding before, during and after, selection of filler wires, monitoring PWHT, inter-pass temperatures, and NDT (VT, PAUT& RT) activities and also ensure all documents relating to the activities are signed off and closed out.

QA/QC WELDING INSPECTOR: (MECHANICAL/ PIPING/TANK/STRUCTURAL & EQUIPMENT)

SUELETTRA NIGERIA LIMITED
01.2014 - 06.2016
  • Coordinate all Mechanical Inspection on rotating, structural & static Equipment(s)
  • Review Radiographic films and coordinate in other NDT activities on site.
  • Inspection of project materials to ensure conformance with the PO and specifications.
  • Generate surveillance inspection during, walk round inspection onsite installation and Shaft Alignment from pump section to gear box section
  • Inspection and Supervision of Rotating Equipment(s) and its alignments as required by the client’s specification: Eg; Produced water Transfer pumps, A/B PA-212-001A/B, Coalescer booster pumps A/B/C PA-512-002A/B/C, Backwash recycling pumps A/B PA-512-004A/B, Backwash water recycle pump: PA-512-003A/B, Tank pumps212-PH-001A/B/C/D Cold shaft Alignment of Knock Out Drum Pumps
  • Inspection and Alignment of Static equipment: Backwash water tank, Back wash settling tanks A/B/C/D, Gun barrel this includes verticality, and leveling
  • Ability to use Total station for the Inspection of Static, equipment.
  • Supervise SPLIT TEE WELDING AND HOT TAPPING OF A 6” BRANCH PIPE ON 12” HP RELIEF HEADER BLOWDOWN project Inspected Tie-in activities of Servicing Pipe line.
  • Conduct welders’ qualification test and monitor production welding inspection.
  • Witness Concrete examinations test in the absence of Civil Inspector.
  • Monitoring of coating and coating repairs of the project at site.
  • Closing out of NCRs, CARs, Deficiency Reports and Site Logs.
  • Coordinate and Witness Destructive (Impact, Tensile, Hardness, Bend, Macro, Micro, Nick Break, Compressive & Pull Test) and Non-destructive Examinations (MPI, UT & DPI,)
  • Review Radiographic film of welded joints.
  • Prepare Pneumatic and Hydro Test Pack and witness the testing operations.
  • Coordinate and Supervise punch list on all developed Systems as per Mechanical/ Piping/ Tank/Structural activities and sign off
  • Coordinate and Supervise Mechanical Completion check list.
  • Monitor Tank Repair, modification (Refurbishment Process)
  • Monitor revamping activities of Crude/Gas Production facility.

QA/QC INSPECTOR: (MECHANICAL/ PIPING/TANK/STRUCTURAL & EQUIPMENT)

PLATFORM PETROLEUM
01.2016 - 05.2016
  • Good in interpretation of ITPs, drawings, and adherence to quality procedures, and standards with excellent team work skills and as such is presently the site QC coordinator, in piping, welding of equipment, and all activities relating to welding on site.
  • Good in documentation
  • Passionate in achieving set goals.
  • Oversea Above Ground Piping, (AGP) and underground piping (UG) activities; checking pipe fit-ups, orientation of piping as per drawings, alignments checks, inspect welders consumables, before, during and after welding ensuring that quality standards and procedures are followed to the later.
  • Involved in material selection prior to welding; that’s the electrode and filler wire types for different materials: LTCS materials for cryogenic lines. Supervised welding of P11, P22, P92 materials in waste heat boilers.
  • Supervise Stainless steel welding; duplex stainless steel
  • Prepare daily weld visual inspection reports and also interphase between clients in resolving critical issues pertaining to work progress.
  • Critically undertake activities ranging from, welding of tanks, equipment, Piping and structures and as such performing excellently well in the day-to-day activities.
  • Coordinator of other welding Inspectors on site with excellent team work spirit towards enhancing organizations targets without compromising quality.
  • Review Radiographic films and coordinate in other NDT activities on site.
  • Inspection of project materials to ensure conformance with the PO and specifications.
  • Conduct welders’ qualification test and monitor production welding inspection.
  • Monitoring of coating and coating repairs of the project at site.
  • Closing out of NCRs, CARs, Deficiency Reports and Site Logs.
  • Coordinate and Witness Destructive (Impact, Tensile, Hardness, Bend, Macro, Micro, Nick Break, Compressive & Pull Test) and Non-destructive Examinations (MPI, UT & DPI,)
  • Review Radiographic film of welded joints.
  • Prepare Pneumatic and Hydro Test Pack and witness the testing operations.
  • Coordinate and Supervise punch list on all developed Systems as per Mechanical/ Piping/ Tank/Structural activities and sign off
  • Coordinate and Supervise Mechanical Completion check list.
  • Monitor Tank Repair, modification (Refurbishment Process).

TOFD & PAUT TRAINEE

DECIBEL NDE TRAINING & INSPECTION SERVICES KERELA INDIA
01.2013 - 04.2013
  • Calibrate and prepare the Doppler Phase Scan Machine for scanning
  • Scan plane preparation using ES-BEAM TOOL5
  • Connect Probes to the Machine for inspection
  • Interpretations of scanned result
  • Calibration of PAUT Machine for; Sensitivity, Wedge Delay, Encoder, Velocity & TCG.
  • Using ToFD Machine for defect sizing; getting and knowing the height of defects.

CORPS LIAISON OFFICER UBURU SECONDARY SCHOOL OHAOZARA, LGA EBONYI STATE.

MINISTRY OF EDUCATION EBONYI STATE (NATIONAL YOUTH SERVICE CORPS)
03.2011 - 02.2012
  • Co-ordinate and organize Community Development Services (CDS) for Corps members in the place of primary Assignment (PPA)
  • Prepare Monthly clearance reports for corps members
  • Taught Chemistry, Physics and Mathematics for Senior and junior secondary classes
  • Conduct other insightful activities for the students to boost their level Academic awareness; Quiz, debates and other games.
  • Develop full scale project plans and associated communications documents.
  • Attend site meetings, technical review and inspections meetings, report regularly on progress and monitor schedule.
  • Manage, supervise and assign responsibilities to the entire workforce on site.
  • Develop and prepare technical reports.
  • Manage, supervise and assign responsibilities to the entire workforce on site.
  • Close out any NCR and follow up corrective action.
  • Raise concessions where necessary.
  • Assess any request to deviate from procedures or requirements and make appropriated recommendation.
  • Implement and encourage HSE policies.

Education

HND - PETROLEUM ENGINEERING

PETROLEUM TRAINING INSTITUTE (PTI)
EFFURUN DELTA STATE

NATIONAL DIPLOMA - PETROLEUM ENGINEERING

PETROLEUM TRAINING INSTITUTE (PTI)
EFFURUN DELTA STATE

GCE - undefined

01-2001

WAEC - undefined

SANCTA MARIA HIGH SCHOOL
OMOKU RIVERS STATE
01-1998

FIRST SCHOOL LEAVING CERTIFICATE - undefined

01-1992

Skills

Good in project coordination, team management and Leadership skill with fluency in written and spoken English

Proactive, assertive and passionate about work with good numerical and analytical skills

Affiliations

  • Member Project Management Professional (PMP) 12191613
  • Member Society of Petroleum Engineers (SPE)
  • Member America Welding Society. # 701178
  • Member National Association of Petroleum Explorationist (NAPE)

Certification

PMP #4400747

Interests

Scrabble, Chess, Traveling

TRAININGS ATTENDED

  • January,2026 Project Management Professional (PMP-PMI) Completed 35PDU with Technical Institute of America (TIA)
  • October, 2015 Certified Welding Inspector (CWI-AWS). (Jabraster Engineering in conjunction with Euro-Tech-INDIA, Port Harcourt, Nigeria)
  • January,2013 Certified Quality Controller (CQC). (Decibel NDE training & inspections, Kerela, India)
  • March,2013 ADVANCED NDT: Time Of Flight Diffraction (TOFD)&Phased Array Ultrasonic Testing (PAUT) (Decibel NDE training & inspections, Kerela, India)
  • March, 2012 SHELL HSE COMPETENCE DEVELOPMENT COURSE, Level 3 (Nigeria Institute of Safety Professionals Port Harcourt, Nigeria)
  • April, 2012 GENERAL HEALTH SAFETY&ENVIRONMENT LEVELS 1 & 2 (Nigeria Institute of Safety Professionals Port Harcourt, Nigeria)

SCRABBLE, CHESS, TABLE TENNIS

Certified PMP, Excellent soft skills; Emotional Intelligence, conflict resolution skills

Timeline

PROJECT ENGINEER

HERITAGE ENERGY OPERATIONAL SERVICES LIMITED (HEOSL) OML30
11.2024 - Current

CONSTRUCTION CO-ORDINATOR. (PIPING/STRUCTURAL/QAQC)

CHEVRON NIGERIA LIMITED (CNL)
05.2020 - 10.2024

QAQC WELDING INSPECTOR (STRUCTURAL/PIPING)

CHEVRON NIGERIA LIMITED (CNL)
03.2018 - 04.2020

QAQC COORDINATOR: (PIPING/STRUCTURAL)

IRON OX NIGERIA LIMITED
01.2018 - 03.2018

QAQC ENGR.: (Piping/Tank/Structural & Equipment)

ONSHORE CONSTRUCTION LIBERAL LIMITED COMPANY (OCLLC)
07.2016 - 06.2017

QA/QC INSPECTOR: (MECHANICAL/ PIPING/TANK/STRUCTURAL & EQUIPMENT)

PLATFORM PETROLEUM
01.2016 - 05.2016

QA/QC WELDING INSPECTOR: (MECHANICAL/ PIPING/TANK/STRUCTURAL & EQUIPMENT)

SUELETTRA NIGERIA LIMITED
01.2014 - 06.2016

TOFD & PAUT TRAINEE

DECIBEL NDE TRAINING & INSPECTION SERVICES KERELA INDIA
01.2013 - 04.2013

CORPS LIAISON OFFICER UBURU SECONDARY SCHOOL OHAOZARA, LGA EBONYI STATE.

MINISTRY OF EDUCATION EBONYI STATE (NATIONAL YOUTH SERVICE CORPS)
03.2011 - 02.2012

FIRST SCHOOL LEAVING CERTIFICATE - undefined

WAEC - undefined

SANCTA MARIA HIGH SCHOOL

GCE - undefined

NATIONAL DIPLOMA - PETROLEUM ENGINEERING

PETROLEUM TRAINING INSTITUTE (PTI)

HND - PETROLEUM ENGINEERING

PETROLEUM TRAINING INSTITUTE (PTI)
ELEMCHUKWU NOSIKE HENRYPROJECT ENGINEER, CERTIFIED PMP #4400747