Summary
Overview
Work History
Education
Skills
Certification
Languages
Hobbies and Interests
Timeline
ec
Derek Fidoro

Derek Fidoro

Aba

Summary

Experienced power plant operations and maintenance engineer with over a decade of expertise in machine operations and maintenance, power generation, power transmission, and more. Proficient in supervising daily power production using gas turbines, steam turbines, and bio-gas plants. Skilled in operating machines, troubleshooting issues, managing planned and unplanned maintenance, and coordinating site and plant activities. Committed to ensuring safety and efficiency in all operations while actively seeking opportunities to drive innovation within the energy sector. Detail-oriented, organized, and meticulous employee who thrives in fast-paced environments with tight deadlines. Enthusiastic team player ready to contribute to the company's success.

Overview

15
15
years of professional experience
1
1
Certification

Work History

CONTROL ROOM ENGINEER (GAS TURBINE-POWER PLANT)

KS-ENERGY AFRICA
03.2024 - Current
  • Successfully managed the daily generation and transmission of 2,400 MWh of electric power using the LM6000PD gas turbine, resulting in a 20% increase in total power output within the Ring fence
  • Monitoring turbine performance, conducting routine maintenance, troubleshooting issues, and optimizing settings for maximum efficiency
  • These efforts improved the facility's overall performance and reliability, significantly boosting power generation and operational productivity
  • Effectively coordinated the Balance of Plant operations, ensuring 99% optimal performance of the power plant
  • Managed auxiliary equipment like pumps, fans, and heat exchangers that support the gas turbine and power generation
  • This involved regular inspections, preventive maintenance, and rapid response to faults, working closely with various teams to maintain equipment efficiency
  • Oversaw the TAS Centrifugal Chiller operation, ensuring the production of 40,000 liters of chilled water daily and boosting turbine efficiency by 10%
  • Managed chiller performance, water production, and equipment maintenance, ensuring optimal operation
  • Regularly monitored temperature and flow rates, conducted maintenance checks, and promptly addressed issues to maintain continuous chilled water supply and enhance turbine efficiency

CONTROL ROOM OPERATOR (GAS TURBINE-POWER PLANT)

GEOMETRIC POWER ABA LIMITED
04.2013 - 03.2024
  • Managed the generation and transmission of 2,400 MWh of electric power using the LM6000PD gas turbine, increasing power output by 20%
  • Monitored operations, analyzed real-time data, adjusted controls, and coordinated with field teams
  • Responded promptly to alarms and malfunctions, ensuring smooth operations and enhancing overall plant efficiency and reliability
  • Coordinated the operation of Balance of Plant systems, achieving 99% optimal performance of the power plant
  • Supervised auxiliary equipment such as pumps, fans, and heat exchangers
  • Conducted regular system checks, troubleshooting, and adjusted as needed
  • Participated in producing 1,000 liters of demineralized water daily, essential for increasing turbine efficiency using the sprint system by 10%
  • Monitored the water production process to ensure quality and managed automated systems for purification
  • Coordinated with field operators for equipment checks and maintenance, ensuring consistent water supply and optimal turbine performance through effective control room management
  • Ensured smooth operation of the TAS Centrifugal Chiller, producing 40,000 liters of chilled water daily to enhance turbine efficiency by 10%
  • Monitored temperature and flow rates, adjusted settings for optimal performance, and coordinated maintenance activities
  • Responded to alarms and issues promptly, ensuring a consistent chilled water supply to support effective turbine cooling and overall power generation efficiency

POWER PLANT OPERATOR (STEAM TURBINE-POWER PLANT)

UNICANE INDUSTRIES
08.2011 - 03.2013
  • Led a team to operate and manage the 25TPH Dual Fuel Boiler, ensuring the daily generation of over 23 tonnes of steam to drive the 4.0MW Steam Turbine
  • Overseeing boiler operation, ensuring efficient fuel use, performing routine maintenance, and optimizing steam production to meet operational demands
  • Managed the production and distribution of over 96 MWh of electricity daily from the 4.0MW Steam Turbine
  • This involved monitoring turbine performance, managing power output, coordinating with distribution teams, and ensuring that electrical power met the factory's operational requirements efficiently
  • Oversaw the Bio-Digest Plant to ensure the daily production of over 20 tonnes of methane gas used in increasing the fuel capacity for the Steam Boiler
  • Daily monitoring gas production, maintaining plant equipment, and ensuring that methane gas supply met the requirements for efficient boiler operation and steam generation

CONTROL ROOM OPERATOR (COMBINE HEAT AND POWER PLANT)

CONTOURGLOBAL SOLUTIONS NIGERIA
04.2009 - 08.2011
  • Operated a 6.5MW Combined Heat and Power Plant, ensuring the efficient generation and transfer of approximately 228 MWh of electricity daily to a manufacturing plant
  • Monitoring plant performance, coordinating power transfer, optimizing energy production, and maintaining equipment to ensure reliable power supply for manufacturing operations
  • Managed the operation of Siat Chillers to produce 20,000 liters of chilled water daily to enhance the CO2 absorption rate in soft drinks by 40%
  • Monitoring chiller performance, maintaining optimal cooling conditions, and ensuring that the chilled water production met the requirements for improving carbonation efficiency in the production process
  • Operation of a CO2 Process Plant to produce over 200 tonnes of carbon dioxide daily to increase the preservation of soft drinks by 80%
  • Managing CO2 production, ensuring the quality and purity of the gas, and coordinating with the production team to integrate CO2 effectively into the soft drink manufacturing process
  • Generation of over 5 tonnes of steam daily using a waste heat and dual heat composite boiler system to enhance the bottle-washing process, resulting in a 60% increase in washing efficiency
  • Managing boiler operation, ensuring efficient steam generation, and coordinating with the cleaning team to improve bottle washing performance

Education

B. Eng - Electrical Engineering

Anambra State University
12.2008

West Africa Examination Council Certificate -

Urhobo College

Skills

  • Communication
  • Teamwork
  • Leadership
  • Equipment operation
  • Troubleshooting
  • Preventive maintenance
  • Control room operations
  • Electrical systems
  • Power generation principles

Certification

  • Certified Carbon Dioxide Process Plant Operator, 06/01/11
  • Health, Safety and Environment. Level 1, 2 & 3, 02/01/21
  • AZUBI-AFRICA. Frontend Development Course, 11/01/23
  • GE LM6000 Familiarization Operation and Maintenance Course, 03/01/24

Languages

English
Proficient
C2

Hobbies and Interests

  • Playing Chess game
  • Watching Movies
  • Website Designing (Coding)

Timeline

CONTROL ROOM ENGINEER (GAS TURBINE-POWER PLANT)

KS-ENERGY AFRICA
03.2024 - Current

CONTROL ROOM OPERATOR (GAS TURBINE-POWER PLANT)

GEOMETRIC POWER ABA LIMITED
04.2013 - 03.2024

POWER PLANT OPERATOR (STEAM TURBINE-POWER PLANT)

UNICANE INDUSTRIES
08.2011 - 03.2013

CONTROL ROOM OPERATOR (COMBINE HEAT AND POWER PLANT)

CONTOURGLOBAL SOLUTIONS NIGERIA
04.2009 - 08.2011

B. Eng - Electrical Engineering

Anambra State University

West Africa Examination Council Certificate -

Urhobo College
  • Certified Carbon Dioxide Process Plant Operator, 06/01/11
  • Health, Safety and Environment. Level 1, 2 & 3, 02/01/21
  • AZUBI-AFRICA. Frontend Development Course, 11/01/23
  • GE LM6000 Familiarization Operation and Maintenance Course, 03/01/24
Derek Fidoro