Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Key Competence
Main Motivation
Personal Information
Coursework
Hobbies and Interests
Certification
reading, table tennis, swimming, playing draft and watching TV
Timeline
Work Availability
Work Preference
Quote
Software
Languages
Interests
Additional Information
Community/village engagement
Generic
ANANWUDE OKEY ANAMATIC S

ANANWUDE OKEY ANAMATIC S

Engineer
Port Harcourt,RI

Summary

Strong electrical & instrumentation experience with over twenty years relevant experience in E&I installation and supervision, project & engineering management, facility upgrade, instrumentation and control systems design. In-depth in instrument installations, calibration, construction, commissioning, process engineering and start-up of oil & gas facilities. Provide expertise knowledge in ESD system, process control system using fieldbus technology, data analysis, process optimization and problem-solving complemented by results-driven mindset and reliability. Optimization professional with strong track record in enhancing process efficiencies and implementing strategic improvements. Known for fostering team collaboration and adapting to dynamic environments. Pursuing full-time role that presents professional challenges and leverages interpersonal skills, effective time management, and problem-solving expertise.

Overview

23
23
years of professional experience
3
3
Certification

Work History

Senior Process Automation Control & Optimization Engineer

SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
04.2021 - Current
  • Provided strong process automation control & optimization (PACO) engineering expertise during conceptual studies, FEED, and detailed design of ANOH projects, reviewed and updated specifications; developed discipline engineering deliverables & strategy to ensure seamless constructability
  • Played major role in the quality of the design device specification within the Instrumentation & Controls space ensuring that in-house engineering team utilizes company approved standards, specifications, and best practices
  • Reviewed vendor design packages from inception to start-up
  • Contributed to development and reviewed design philosophies with other discipline engineers and subject matter experts (SME)
  • Defined requirements, evaluates alternatives, and recommended solutions for technical issues within Instrumentation & Electrical space
  • Part of cross-functional team that generated and developed detailed engineered MTO package and supported technically engineering services acquisition, including development of the Job Specification, Request for Services, technical / commercial evaluation, and award
  • Reviewed, updated & finalized all engineering deliverables (Design basis, Instrument Index, I/O list, data sheets, System architecture, F&G mapping, SIL implementation, Layouts, Cable sizing, cable schedule, schematics, Test procedures and report, Vendor drawings, cable sizing, Adequacy study report…etc.)
  • Actively participated in different workshops Independent Project Review (IPR), Cost Optimization Review (COR), Value Engineering (VE) of ANOH Upstream and Midstream primary treatment plant (PTF)
  • Responsible for development of process automation control & optimization (PACO) work scope and made substantial input to electrical scope of work for Assa-North upstream & midstream activities
  • Participated in project schedule definition and sequencing of task aligning predecessor - successor
  • Prepared management of change(MOC) for deviations to design practices, standard & procedures during constructability, coordinates the review and defend such before engineering and execution manager and when approved, logs and transmit to construction team for implementation
  • Strongly supported operation, maintenance and commissioning team during precommissioning/commissioning phase with guiding documents and best practices to deliver cost-efficient, fit-for-risk maintenance upstream scope adjudged to be a world class project haven followed quality assurance/control processes
  • Manages the instrument discipline deliverables updates/relines and interfaces with field engineering in support of construction activities to mechanical completion
  • Where needed, develop short term mitigation plans to achieve intermediate milestones and bridling scope for final completions
  • Prepared installation work pack (IWPs), WMS and construction work procedure for upstream & midstream scope
  • Participate in weekly construction meeting, deliver highlights as pertain to PACO
  • Carry out in-depth analysis of PACO design/connection drawings highlighting defective design
  • Ensure work is carried out safely with AFC drawing and in line with design
  • Prioritize daily tasks, coordinating workflow and delegating tasks to meet team goals
  • Review and optimize processes to improve project efficiency
  • Liaised with cross functional design team and modeled new concepts to address upcoming challenges in project
  • Work with gas turbine vendor, monitoring and executing electrical & instrumentation system design and cable routing
  • Prepared instrumentation cost, time and resource requirement estimates on assigned projects
  • Delivered Assa north upstream production facility from engineering – construction – commissioning ready to supply gas to JV partner

Instrumentation Engineer

SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
01.2018 - 03.2021
  • Participated in all projects related technical discussions, leading project management aspects, participated in the project FAT, IFAT, SAT & PAT activities and ensuring timely closure of all activities as per planned and schedule
  • Considered and reviewed field instrumentation specifications which includes In-line instrumentation and valves such as Flow meters, Control valves, On-Off valves (ESD/EDP/ Emergency Isolation, MOV /ROV, GOV), Metering skid
  • Analyzers package, Level, temperature, flow & pressure instruments, PSV, F&G devices and systems
  • Managed construction and commissioning of Central Processing Facility Comprising: AG booster Compressors, NAG Slug Catcher, Coolers, Twister gas technology, Condensate handling/disposals, export gas compressor & metering
  • Provided clear guidance to the EPC Contractor and subcontractor and facilitates resolution of engineering/ construction issues to meet project objectives and milestones
  • Reviewed instrument data sheets, location layout, termination, loop drawings and cable specification/routes
  • Made input to PAS, SIS, F&G specifications, Cause and Effect diagrams and actively supervised its deployment
  • Generated long-lead items, bulk materials and other MTO and supervised installation, configuration & testing of instrumentation & control system, F&G system, PAGA and Intrusion Detection Surveillance Systems (IDSS) in TUNU and OGBOTOBO
  • Supported assessment of existing system performance in terms of obsolescence, spare parts availability, reliability, and integrity
  • Upgraded existing Tunu & OGBOTOBO flow-station from pneumatic system to automated control system (ROCI level 3) and provided low pressure AG booster compression station
  • Ensured all planning and execution activities associated with material specification, procurement, construction to mechanical completion of both field & host instrumentation were achieved by main contractor including third parties vendors, consultants, sub-contractors were executed according to project’s specifications and client requirements
  • Oversaw construction and precommissioning activities for entire site, ensured main contractor and subcontractor executed instrumentation activities and delivered systems and subsystems as per designed throughout the processes of planning - execution - completion
  • Supervised Installation and commissioning of 3 main electric power generation system (Electrical & Instrumentation Scope), 7 No centrifugal gas compressors/drivers
  • Carried out AS-built verification of TUNU CPF plant
  • Aided MAC to integrate and automate the overall system for process, safeguarding and controls

Instrumentation Engineer

SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
01.2015 - 10.2017
  • Developed and reviewed instrumentation dossiers (IWP, WMS, Construction Work Procedure)
  • Supported contractor in addressing gaps and coordinate with operations and other disciplines in ensuring seamless project delivery
  • Delivered scope of work for the assigned area instrumentation to achieve project expectations, in particular design and construction of very large facilities
  • Maintained close liaison with members of engineering, quality, commissioning and asset team by ensuring work execution is technically aligned in compliance with project objectives, instrument specification and industry best practices
  • Reviewed and updated procedures and specifications ensuring that all engineering/construction references are up to date and relevant
  • Demonstrated good design management experiences, financial, commercial, strong interface working skills and the ability to prepare clear, comprehensive and concise engineering documentation
  • Provided technical direction and implemented project construction work processes, procedures, manuals and systems ensuring that contractors are building to the latest revision of drawings, specifications and procedures
  • Ensured all works are performed safely and in accordance with project procedure and specifications
  • Ensured Non Conformance Reports and Corrective Actions are prepared, collated and closed out prior to turnover
  • Supervised installation & precommission of field instruments( FF/ HART transmitters, venturi wet glass meter with manual sampling system, motorized shut down & choke valves, MEG & corrosion inhibitor injection packages), JBs, marshaling and system cabinets complete with power converters, surge protectors, redundant power supplies and controllers and other accessories required to complete installation as specified in the relevant drawings
  • Witnessed instrument calibrations, SAT, loop checking of I/O modules from FAR to field and related documents and certificates
  • Cross checked FAT systems and ensured punch list were raised and close out
  • Participated actively in Failure/Root Cause analysis process (RCA) & performed Incident Investigations
  • Participated in simulation & application of various instruments, F&G, Analyzers, initiate & reset OSD/ESD with strong experience in DCS, SIS, PLC, HMU, SCADA and RTU
  • Actively participated in loop checks, precommissioning/commissioning and start-up of K2S well 43 & 45

Instrumentation Engineer

ROCI- SHELL PETROLEUM DEVELOPMENT COMPANY
07.2012 - 12.2014
  • Carried out survey with survey contractor and review site survey report
  • Carried out design verification identifying missing deliverables for modification
  • Developed CAO SCADA I/Os, PEP, instrument MTOs and issue range to cost estimating team
  • Developed field instruments specifications and data sheets
  • Prepared & reviewed high level and detailed work scope
  • Carried out coding of materials (LLI, bulk materials) in SAP to progress procurement
  • Attend weekly & monthly project meetings – delivers project highlights
  • Participated in Adibawa work scope review workshop
  • Participated in CAO SCADA hazop workshop for both Adibawa & Bonny flow station
  • Supervised STS2 Vmonitor implementation, commissioning & handover(Jan – Sept 2013)
  • Provided technical support for Soku flow station CAO SCADA implementation(July 2012 – Dec 2012)

Instrumentation Engineer

SHELL PETROLEUM COMPANY PORT HARCOURT
12.2011 - 06.2012
  • Developed and specified Instrumentation MTO, asset register and loaded in CMMS
  • Prepared Instrumentation specifications for Control valves, SDV, flow Orifice, Relief valves, Transmitters, Positioners, cables and provided input to segment design
  • Participated actively in technical/ commercial bid evaluation of MTOs and reviewed work scope
  • Provided input to design, construction, installation, cable termination & loop drawings, data sheets and other technical specifications
  • Participated actively in field Instrumentation installation, hooked-up, precommission and commissioned Delta V PAS control system, HIMA IPF (SIS) system and other proprietary vendor application protocol and licenses
  • Integrated seamlessly new field instruments into existing Awoba AGG control and automation system
  • Carried out sequential pressure letdown of recycled gas to required pressure regimes of compressor stages 3, 2, 1 normal plant operation and startup Awoba gas plant

Senior Site Supervisor

SHELL PETROLEUM DEVELOPMENT COMPANY WARRI
07.2010 - 11.2011
  • Supervised all works related to E & I discipline (oil & gas facilities, public address systems etc)
  • Monitored Instrumentation systems DCS, TRICONEX and rigged up from control room to field
  • Coordinated with operations and ensured compliance with project requirements
  • Part of cross functional team that developed and reviewed precommissioning procedures and verification of readiness (VOR) of sub units and systems for commissioning
  • Involved in the permit to work preparation that ensured activities are well coordinated
  • Reviewed planning updates and progress for discipline related activities
  • Proactively anticipated problems and provided solutions and cascade to hierarchy
  • Reviewed contractor documents- method statement, construction procedures, coordinated material verification and traceability
  • Ensured approved for site modifications were implemented and documented for AS-built
  • Led site verification or survey in related discipline and coordinated reporting of result
  • Played proactive role in simultaneous operations planning, covering interface between construction, maintenance & production activities
  • Supported and enforced HSE project objectives and directives, HSE management systems
  • Revamped and precommission NGC Compressor Station at Uzere, Olomoro
  • Part of the team that scoped instrumentation & control system part- Ogbotobo Flow station southern swamp 2

Instrument Engineer

DAEWOO NIGERIA LTD, PORT HARCOURT
02.2009 - 06.2010
  • Company Overview: CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
  • Provided instrumentation and control engineering input in the review & verification of design data, reports and studies
  • Analyzed current equipment; identified areas of inefficiency and needs for improvement in engineering design and developed instrumentation to meet those needs
  • Collaborated with team of engineers that developed accurate, efficient equipment and instrumentation in accordance with safety and usability standards and client expectations
  • Constructed and commissioned fire detection system, interfaced instrumentation to control system
  • Provided oversight in the preparation /updating of control on ESD system, process & advance control systems
  • Participated actively in equipment selection and specification, vendor document review and approval
  • Ensured consistent application of world class engineering standards, Infrastructure planning and update
  • Responsible for the installation, termination and precommissioning checks on HIMA panels, Allen Bradley panels, PAS panel, OPC cabinet in Field Auxiliary Rooms, Central Control Room
  • Responsible for installation, termination and precommissioning of valves: MOV, ESD, Control, ON-OFF, SDV, Blow Down, and Gate valves
  • Provided expertise knowledge in Foundation fieldbus and HART
  • Participated in SAT and precommissioning checks on gas turbine generator, associated gas & booster compressors
  • CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA

QC Engineer, Instrumentation

TEMEC NIGERIA LIMITED (OIL& GAS CONSULTANT TO SPDC)
01.2005 - 12.2008
  • Reviewed work method statement, JHA, ITP for excavation, cable pulling/laying, tray installation, lifting, loading & unloading of material, installation of instrument cabinets, cable termination
  • Monitored work progress daily to verify compliance with project requirements, BTIP Quality policy, and relevant BTIP site construction monitoring procedures
  • Performed assurance checks and surveillance inspections on contractor site works, reviews and follow them up
  • Highlight all unsafe conditions to contractor workforce for immediate rectification and report unsafe condition that cannot be rectified immediately to senior management level
  • Monitored Installation, cable termination/ precommissioning of the followings: PAS System, Tank Gauging System, SIS System, Fire & Gas System, Machine Monitoring System, Motor Operated Valve(MOV), Control, ON-OFF and ESD valves communication network
  • Carried out quality control processes on all installed instrumentation systems, issued CAR and NCR where necessary, signed off A check sheet and log in the system

Site Engineer Electrical

CHRIS ELECTRICAL CO.LTD
01.2004 - 12.2004
  • Company Overview: CONTRACTOR TO S.P.D.C, PORT HARCOURT
  • Community electrification (Gas turbine) Oloma, Bonny
  • CONTRACTOR TO S.P.D.C, PORT HARCOURT

Instrument Technician

02.2002 - 08.2002
  • NLNG TRAIN 5, BONNY
  • COMPANY: DAEWOO NIGERIA LIMITED, NLGN PROJECT BONNY CLIENT: TSKJ/NLNG NIGERIA LIMITED

Education

B.Eng - Electrical/Electronic Engineering

Nnamdi Azikiwe University
01.2001

Skills

  • Monitor work schedule
  • Multi-tasking
  • Engineering solutions
  • Design
  • Fabrication
  • Installation
  • Commissioning
  • Start-up of oil & gas facilities
  • Optimization
  • Adaptability
  • Achievement oriented
  • Team player
  • Responsibility
  • Simulation equipment
  • Troubleshooting
  • Root cause analysis
  • SPI
  • Intool
  • Decision analysis
  • Cost reduction
  • Optimization techniques
  • Energy efficiency
  • Teamwork and collaboration
  • Facility location

Accomplishments

Delivered Assa North upstream facility with combine in place volume of 4.3Tcf gas and 197 MMbbls condensate with accuracy & efficiency within schedule and without cost overrun. Upstream processing facility is delivering 600MMscf/d based on available reserves and the requirement is to feed two separate 300MMscf/d capacity plants of JV partner.

Also played outstanding role within multi functional team in delivery of: SSAGS production facility, Gbaran Infill & K2S package 1, 2, 3 project, BTIP Bonny, CAO SCADA upgrade in Adibawa & Soku, Awoba makeup gas and West re-entry project in Batan. These projects delivered within cost and schedule , still producing with high accuracy and efficiency till date.

Affiliations

  • COREN (R.21754)
  • MNSE (18867)
  • NIEEE

Key Competence

  • Monitor work schedule and ensure that slips are quickly detected, flagged and recovery achieved.
  • Ability to multi-task and also provide good engineering solutions to daily operation of field instruments.
  • Input to design, fabrication, installation, commissioning & start-up of oil & gas facilities.
  • Provide expertise to carry out optimization throughout project life cycles.
  • Willingness to take-up new challenges on the job & highly adapted to different work situations.
  • Achievement oriented & excellent team player with high sense of responsibility.
  • Very efficient on the use of simulation equipment for troubleshooting and recovery.
  • Good knowledge of SPI, Intool.

Main Motivation

  • Career challenging & enhancement opportunities and sharing ideas in a multi discipline team.
  • Objective assessment when outstanding milestone achieved.
  • On the job competence appraisal and opportunity for growth.
  • Team playing.

Personal Information

  • Date of Birth: 04/05/75
  • Nationality: Nigeria
  • Marital Status: Married

Coursework

  • FMC Wellhead Control Panel Training on component assembly & functionality, 2017, K2S Bayelsa
  • Solatron Wetgas Metering system Training on installation, operation & maintenance, 2017, K2S Bayelsa
  • Mokved/DAC High Integrity Pressure Protection System (HIPPS) installation, operation & troubleshooting, 2017, Bayelsa
  • PTW system competence training for PA and AHSS, 2016, Port Harcourt
  • VMonitor training for pipeline & well surveillance monitoring, 2013, Port Harcourt
  • Smar 302 system- CAO SCADA operation & maintenance, 2013, Port Harcourt
  • ISO 9001 awareness training, 2004, Port Harcourt, Nigeria
  • ISO 14001 course, 2005, Bonny, Nigeria
  • Enhanced contract management training (module1), 2004, Port Harcourt
  • Hearts and Minds workshop, 2004, Benin, Nigeria

Hobbies and Interests

  • Reading
  • Swimming
  • Table tennis
  • Draft
  • Watch TV-look out for global news/events.
  • Tourism

Certification

COREN - (Council For Regulation Of Engineering Practice In Nigeria) (2011 December 15th). R.21754.


NSE - Nigerian Society Of Engineers (2007 November 18th).

18867.


NIEEE - Nigerian Institution Of Electrical Electronics Engineering

April 2021.


vMonitor - vMonitor Oil Field (2013 July 29th).


reading, table tennis, swimming, playing draft and watching TV

A voracious reader of new novels, magazines and articles bordering on international news/events, science & technology, emerging trends, watch TV with keen interest on developing stories, events on global scale. I love watching football and national geographic wild alot Occasionally visits recreational centres and swimming pool to play tennis, draft and display diving skills, breast and back strokes. These help muscular relaxation and enables blood circulation effectively.  With these extra curricular activities embedded in my schedule, I could guarantee maximum concentration on any given tax until it is delivered without supervision.

Timeline

Senior Process Automation Control & Optimization Engineer

SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
04.2021 - Current

Instrumentation Engineer

SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
01.2018 - 03.2021

Instrumentation Engineer

SHELL PETROLEUM DEVELOPMENT COMPANY NIGERIA
01.2015 - 10.2017

Instrumentation Engineer

ROCI- SHELL PETROLEUM DEVELOPMENT COMPANY
07.2012 - 12.2014

Instrumentation Engineer

SHELL PETROLEUM COMPANY PORT HARCOURT
12.2011 - 06.2012

Senior Site Supervisor

SHELL PETROLEUM DEVELOPMENT COMPANY WARRI
07.2010 - 11.2011

Instrument Engineer

DAEWOO NIGERIA LTD, PORT HARCOURT
02.2009 - 06.2010

QC Engineer, Instrumentation

TEMEC NIGERIA LIMITED (OIL& GAS CONSULTANT TO SPDC)
01.2005 - 12.2008

Site Engineer Electrical

CHRIS ELECTRICAL CO.LTD
01.2004 - 12.2004

Instrument Technician

02.2002 - 08.2002

B.Eng - Electrical/Electronic Engineering

Nnamdi Azikiwe University

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Work Preference

Work Type

Full TimeContract Work

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementPersonal development programsTeam Building / Company RetreatsCompany CultureWork-life balanceHealthcare benefitsWork from home optionPaid time offPaid sick leaveFlexible work hours

Quote

There is a powerful driving force inside every human being that, once unleashed, can make any vision, dream, or desire a reality.
Tony Robbins

Software

Word, Excel, Powerpoint

Languages

English
Bilingual or Proficient (C2)
Igbo
Bilingual or Proficient (C2)

Interests

Intool, SPI, 3D model, Control & Automation Certifications

Additional Information

Team-lead that rigged up instrumentation system on Anoh HP/LP flare stark, TEG Contactor with height 52 and 22 meters respectively. The enthusiasm is that hookup were conducted safely even when these high risk operation were already on foundation(installed). I coordinated planning, material selection & aggregation, installation to completion. These milestone were achieved without any incident/accident by local personnel.

During startup of Shell K2S well 45 & 47 in Bayelsa Nigeria, I was responsible for the operation/control of Manual Choke valve - choking 600 bar pressure from the reservoir upstream to Auto Choke until operation were stabilized. The plant were put into normal operation with minimal disruption.

Community/village engagement

Passionate about progress and development of my village. This led me to immense financial commitments to develop the youths in terms of knowledge & information sharing, small startups for business and self dependency. In fact in 2023, i committed sum of 1 million and five hundred thousand naira respectively to ensure my village produced the town union president and deck community gathering/meeting building at the village square. that we successfully achieved.

ANANWUDE OKEY ANAMATIC SEngineer