

Results-driven Electrical Engineer and Project Manager with over a decade of expertise in high-voltage transmission infrastructure and power systems in Nigeria. At the Transmission Company of Nigeria (TCN), successfully managed projects exceeding $70 million across the Northeast region amid insurgency challenges, delivering all on schedule with zero safety incidents and full commissioning. This leadership ensured reliable grid expansion and enhanced energy access in high-risk environments.
Enhanced technical proficiency through a specialized Electrical and Instrumentation course undertaken at sea in 2018, integrating advanced skills in system automation, control, and monitoring into daily project execution. Proven track record in stakeholder coordination, risk mitigation, contract administration, and multidisciplinary team leadership, driving EPC solutions for substations, renewable integration, and private networks.
Oversaw full lifecycle of 132-330kV EPC projects with a focus on conceptual design to O&M handovers.
Led substation execution in compliance with Nigerian Grid Code and World Bank ESS2 standards.
On request
Solving puzzles and Travelling
Impact of Normal Inverter Operational System (MRE project) submitted to the Department of Physics, Kaduna State University, Design, Construction and Testing of handheld metal detector (Final Year Project), submitted to the Department of Electrical Engineering, University of Maiduguri
TCN/PMU/WB/NTP-TR3 Lot 1, 2025-11-12, Rehabilitation & Reinforcement of 330/132kV and 132/33kV Transmission Substations (Package 3) NETAP, EPC Contract, Yola, Adamawa, Mayo Belwa, Adamawa, Bauchi, Bauchi, Damaturu, Yobe, Maiduguri, Borno, Biu, Borno, Potiskum, Yobe, NTP-TR3 LOT 1, The scope is as follows: ..., MBH Power Ltd/Shreem Electric Ltd, 08075101520, JV of Tractebel Engineering GmbH/Otis Engineering Ltd., 07063459049, Engr. Bashir Musa, 08026552095, Engr. Amina Ahmad Mimi, 08030642772, 2021-01-24, 2021-10-12, 24 Months, 2023-10-12, 2025-12-31, World Bank Funding, 100% completed., 100% completed., 2025-10-31, All pending activities for power transformer energization, TITO erection and stringing, cable laying and termination, equipment-equipment stringing, etc at Mayo Belwa shall be completed and energized by December, 2025., Integration of the SAS to the existing system, Connection of the substation to NCC, Outage requested for Old Bauchi TS rehabilitation work., Outage requested for Biu TS rehabilitation work., Outage requested for Potiskum TS rehabilitation work., To work with NISO, NCC and NERC for all outage required. TCN Management is expected to get clearance for these outages to enable us complete pending line activities in accordance with the approved work schedule for each site., Engr. Amina Ahmad Mimi, Project Engineer, 2025-11-11, Engr. T. M. Bamalli, AGM/Project Manager, 2025-11-11