Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic
ALEJANDRO AUGUSTO CASTILLO ORTIZ

ALEJANDRO AUGUSTO CASTILLO ORTIZ

Mérida

Summary

With over 31 years of experience in architectural design, civil works, and construction management, and 26 years offshore on barges and DP ships, I specialize in gas and oil installations. My expertise includes marine pipelines, platform interconnections, risers, trenching, concrete mats, and turbines, as well as instrumentation, electrical, and mechanical elements. I also coordinate onshore construction yards and manage marine operations for loading, transporting, and installation.

Overview

24
24
years of professional experience
1
1
Certification

Work History

Sr. Project Engineer

Subsea 7
08.2023 - 05.2024
  • Prepare scopes of work for subcontracts and review / evaluate subcontractor documentation.
  • Manage administrative tasks plans for project engineering, as required.
  • Report to the Project Engineering Manager, and other stakeholders.
  • Developed, tested and implemented innovative engineering solutions for projects.
  • Provided technical guidance and project management to junior engineers.

Sr. Project Engineer

J Ray Mcdermott de Mexico S.A. de C.V.
08.2018 - 07.2023
  • Provided technical guidance and project management to junior engineers.
  • Developed, tested and implemented innovative engineering solutions for projects.
  • Coordinated with multiple departments to ensure project timelines were met.
  • Conducted cost analysis on proposed projects and presented findings to senior leadership team.
  • Assisted in the development of new technologies related to products and services.
  • Pipeline installation, Trenching, Hydrostatic Testing, Top side installation of process pipe lines, instrumentation and electrical systems, Construction (Structural), presentation of DPR´s and progress to the client.

Offshore Operations Manager

Drebbel de Mexico S.A. de C.V
01.2018 - 08.2018
  • Developed and implemented strategies to increase customer satisfaction and loyalty.
  • Created monthly reports for senior management summarizing operational performance metrics.
  • Resolved conflicts between employees by providing guidance on company policies and procedures.
  • Maintained up-to-date records of employee attendance, payroll information, vacation requests.
  • Implemented new technologies to streamline operations, reduce costs, and improve customer service.
  • Performing Submarine Surveying Work with Bathymetry, ROV, Multibeam, Pipetracker and Sub Botton Profile (SBP), OOS (OUT OF STRAIGHTNESS), Trench, Stabilized and installing Concrete mats in submarine Pipeline.

Personal Out Sourcing Pemex Exploration

Technical Supervisor Senior Offshore Specialist
03.2005 - 05.2017
  • Deal with foreign personnel in various vessels as well as the qualification of welding procedure for the laying of line of the company Mc Dermott in Amelia, LA, United States of North America.
  • Follow-up on the Documentary development and the Works programs for the good performance of the Work, DPR´s and progress to the different oil complexes and to the headquarters in the offices in Cd. Del Carmen.
  • Coordination of the activities in the vessels with anchors and dynamic positioning (DP) with personnel of marine guarantee and positioning of Pemex (Survey).
  • Supervised the monitoring and installation of the structural elements and pipes for the transport of Gas and Oil to the platforms in the Campeche Bay, following the national and international norms in the matter of anticorrosive protection, welding, structure, process pipe, electrical and instrumentation.

Supervisor of Work A

Company Turbinas Solar (SYNERCON)
07.2003 - 01.2005
  • Direct Treatment with Pemex Personnel and Foreign Personnel (United States) for the Delivery of Reports, Programs and Graphics of the Advances of the Work.
  • Supervision of the Works to the DEMAR Company in the Installation of Centaur Turbochargers 50 (Offshore) in the Akal-C / Perforation Platform and in the CPTG ATASTA (On Shore) in the Different Structures, Pipes, Electrical, Mechanical and Instruments (According to International and PEMEX Standards)
  • Developed and implemented operational policies and procedures to ensure efficiency and accuracy of workflows.
  • Maintained accurate records of employee performance, attendance, leave requests, and disciplinary actions.
  • Tracked progress on projects and provided timely feedback to staff members.

Field Engineer A

Company ECH OFFSHORE
07.2000 - 04.2003
  • Responsible for the development of boating with anchors and dynamic positioning (DP) for pipelines, Construction (Structural), Libranza, Hydrostatic Tests and Corrosion Activities on and Low Level of Platforms, Personnel Logistics, Conciliations with Pemex (Work Log, Informative Notes and Daily Activity Reports) of the following projects:
  • Develop plans of transportation and installation piprlines
  • Interconections and pre comissionning on top side of platforms.
  • Created detailed documentation of network configurations and settings.

Education

High School Diploma -

Bachilleres De
Veracruz, Mexico
06-1998

Architectural Engineering

Universidad Cristóbal Colón
Veracruz, México
02-1993

Skills

  • Environmental Regulations Compliance
  • Information Analysis
  • EPA regulations adherence
  • Engineering project design
  • Project Planer
  • Internet Explorer
  • Power Point
  • Primavera Project Planner
  • Design review
  • Innovation management
  • Scheduling expertise
  • Engineering Design
  • Auto Cad

Languages

Spanish
First Language
English
Intermediate (B1)
B1

Certification

  • Intensive English in the U.C.C. / February to June 1989
  • Course Cad12, in the U.C.C / May to June 1996
  • Introductory Master of Structures at the Institute of Engineering of the Universidad Veracruzana / 1996.
  • Course on "Urban Regulation of the Municipality of Mérida" Obtaining Certificate of Construction Expert / June 2007
  • Course for "Signatory of Work with Risk" of Pemex / July 2008.
  • Diploma in "Planning, Project and Urban Design" Duration 160 Hrs / August 2008.
  • Course on "Structural Design and Alternative Materials" / September 2008.
  • Course on "Wastewater Treatment" / September 2008.
  • Basic Survival Training Course in the Sea / January 2013.
  • T-Bosiet / CA-EBS 29/08/2023 and 16/0272024

Timeline

Sr. Project Engineer

Subsea 7
08.2023 - 05.2024

Sr. Project Engineer

J Ray Mcdermott de Mexico S.A. de C.V.
08.2018 - 07.2023

Offshore Operations Manager

Drebbel de Mexico S.A. de C.V
01.2018 - 08.2018

Personal Out Sourcing Pemex Exploration

Technical Supervisor Senior Offshore Specialist
03.2005 - 05.2017

Supervisor of Work A

Company Turbinas Solar (SYNERCON)
07.2003 - 01.2005

Field Engineer A

Company ECH OFFSHORE
07.2000 - 04.2003

High School Diploma -

Bachilleres De

Architectural Engineering

Universidad Cristóbal Colón
  • Intensive English in the U.C.C. / February to June 1989
  • Course Cad12, in the U.C.C / May to June 1996
  • Introductory Master of Structures at the Institute of Engineering of the Universidad Veracruzana / 1996.
  • Course on "Urban Regulation of the Municipality of Mérida" Obtaining Certificate of Construction Expert / June 2007
  • Course for "Signatory of Work with Risk" of Pemex / July 2008.
  • Diploma in "Planning, Project and Urban Design" Duration 160 Hrs / August 2008.
  • Course on "Structural Design and Alternative Materials" / September 2008.
  • Course on "Wastewater Treatment" / September 2008.
  • Basic Survival Training Course in the Sea / January 2013.
  • T-Bosiet / CA-EBS 29/08/2023 and 16/0272024
ALEJANDRO AUGUSTO CASTILLO ORTIZ