An innovation-focused and meticulous professional with over 16 years of technical and managerial experience in Telecom Power Systems, Engineering (Electrical & Mechanical), Maintenance Management, Operations Management and Energy Management. A certified City Guilds London, UK Mechanical Engineer, a USA certified Project Management Professional (PMP) with an MSc in Electrical Engineering (Instrumentation and Control); timely and contemporary solutions have always been excellently and satisfactorily achieved. Excellent communication skill at all level and effective use of initiative. An admirable team player to locals and non-locals, excellent planning, follow up and troubleshooting expertise, customer-centric approach to deliverables, result oriented, business objective driven, delivering high standard in Quality of Service (QoS) and revenue oriented management style. The interest is to take-up a challenging role to enable one deliberately achieve the overall business and corporate objective.
• Performed installation of 20% of overhauled Pumps using plumb bob or DTI to maintain good eccentricity of shaft and coupling end where Prime Mover is attached.
Project optimization: Ensured that entire project scope delivery within planned budget
Multiple project coordination: Power components, Active site components, Manpower management, Client management, Logistics management, Granting approvals, Performing acceptance test then Successful handover to client
Project risk assessment: Identifying all risk factors in project lifecycle then mitigated them
Developing project plans: Realistic project plan was structured which was adhered with
Problem Solving: Resolving of all technical needs timely
Attention to Details: Required license for Logistics, Site Master for VSWR alarm then Earth Resistance tester were identified to be lacking which were timely resolved
Creativity: War room project reporting forum was created for timely follow up as to update promptly
Excellent Communication: Achieved milestones were timely communicated to all key stakeholders
Team Player: There was regular team bonding, then rewarding of performance
Troubleshooting: Identified wrong connections in ATS power system panel was corrected which enabled generators synchronize with power supply from grid power supply
Customer-Centric: Ensured that customers expectations were met then surpassed
Mechanical engineering: Addressed preventive and corrective maintenance
Electrical engineering: Technically resolved power system and grounding failure
PMI, Project Management Professional(PMP)
Member Council for the Regulation of Engineering in Nigeria
Member Nigerian Society of Engineering
PMI, Project Management Professional(PMP)