Abraham MacPepple

Engr.
Port Harcourt

Summary

Possess good knowledge of Planning and execution techniques in EPCI projects in accordance with the relevant procedures and standards in the Oil and Gas industry.

Certified training in the application of Project Management Professional for general project management + advance use of project scheduling tools; Primavera P6 and Microsoft Project.

Summary of experience includes; Inspection exercise for Vessel Assurance Verification for project specifications, Detail Construction and Installation Engineering Procedures, Structural & Piping Fabrication and Installation for Topside and Subsea Locations, Load Out, Transportation and Installation of pre-fabricated structures/Deck modules, Pipelines and flow lines, etc in Revamp and Field Restoration Projects, Riser Repair and Maintenance Projects, Well Head/Gas Lift and Injection Projects, Brown Field Hook Up & Tie-In works, Pile Installation and Foundation etc., having participated as Field/Site Engineer, Methods & Installation Engineer, Engineering Coordinator, Project/Construction Engineer and Construction Supervisor in EPCI projects for ExxonMobil, Chevron Nig. Ltd, SPDC, Tenoil etc.

Overview

18
18
years of professional experience
12
12
years of post-secondary education

Work History

Construction Superintendent

Navante Oil and Gas Company Ltd.
Lagos
10.2019 - Current

PROJECT OVERVIEW

Client: Nigerian Petroleum Development Company

Opuama Flow Station (OML 40) Debottle-necking and Optimization Project

An EPCI Contract for development of FEED, Concept engineering and Project Execution, Construction Management and Supervision for: Design, Procurement, Detail Engineering, Provision of HSE and Quality Assurance & Control, Detail Construction Engineering for Fabrication, Load out, Sea Fastening, Installation, Pre-commissioning and Commissioning of;

  • Crude Manifold Extension & Appurtenances
  • Electrostatic Heater Treater
  • 3 – Phase Separator
  • Water Treatment System
  • Interconnecting Piping Spools
  • Electrical & Instrumentation Systems
  • The debottle-necking and upgrade project is to enable the facility to achieve an increase in the current production capacity from 30,000 BLPD to 60,000 BLPD with less than 0.5% BS&W produced crude and water treatment package to achieve a discharge specification of 10 ppmv with disposal via well re-injection

JOB DESCRIPTION

· Support design engineering as to ensure constructability

· Review and develop instruction related deliverables

· Coordinate constructability reviews and logistics planning for mobilization

· Ensure construction equipment and personnel are fit for purpose

· Coordinate yard activities and resource requirement for effective fabrication operations

· Supervise and coordinate the activities of construction workers and engineers

· Provide daily supervisory surveillance checks and records, ensuring that contractors management and supervision are providing safe working conditions and permitting procedures, protective equipment, experienced/qualified supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets.

· Routinely study, check, review and validate the discipline scope of work against the appropriate fabrication/construction requisition to ensure the Fabrication and Construction workers correctly interpret and comply with the latest revision AFC drawings, quantities and specifications.

· Ensure proper control of charges, raise NC’s, reviewing TQ’s to ensure responses are appropriate and practical, and reviewing ARNs to ensure correct use of construction resources.

· In conjunction with other disciplines, ensure contractor interfaces are both coordinated and planned to allow effective take over by follow-on Fabrication/Construction workers and efficient access to work areas and job phases.

· Utilize weekly coordination meetings with other disciplines to provide logical progress and target completions as per the contract schedule and daily work plan. Ensure that area/handover documentation is available and reviewed.

· In conjunction with other disciplines, ensure Fabrication/Construction interfaces are both coordinated and planned to provide logical progress and target completions as per the contract schedule and daily work plan.

· Ensure that Fabrication/Construction workers survey and accept their work areas and commence contracted works within schedule time requirements, mobilizing supervision, materials and equipment in practical logical sequences.

· Ensure that Fabrication/Construction workers working on site have temporary facilities, equipment and hand tools etc. that are fully capable of supporting contractors site needs in the execution of contracted works to meet scheduled completions.

· Ensure practical security and protection of the works and that all contractors provisions for temporary lighting, transport, vessels, plant and equipment, hand tools are in adequate supply and totally fit for purpose.

· Ensure that construction workers are working in the required work areas, locations, elevations and sequence of work by providing discipline scheduled completion details to enable efficient planning of all activities. With the planning Engineer develop detailed daily and weekly work plans to facilitate project schedule completions.

· Ensure supervisors/inspectors carry out the witness, inspection and surveillance check in accordance with contractor discipline inspection and Test Plans, and the Navante site quality Plan.

· Ensure all approved modifications to Works are recorded on red-lined as built drawings and are verified as correct by field personnel.

· Review and communicate to Navante staff and contractors the commissioning procedural executions and inspection criteria for all pre-commissioning activities.

· Review method statements for pre-commissioning and commissioning activities to ensure work phase co-ordination and integration has been considered and all the Project Quality and HSE requirements have been complied with.

· Reports on work status/problem areas/needs

· Support bid packages as and when assigned.

Lead Construction Engineer

Johnkramer Nigeria Limited
07.2015 - 09.2019

PROJECT OVERVIEW

Client: Tenoil Petroleum & Energy Services

ATA Field Development Project - An EPCI Contract for development of FEED, Concept engineering and Project management and supervision for the: Design, Procurement, Detail Engineering, provision of HSE and Quality Assurance and Control and Detail Construction Engineering for Fabrication, Load out, Sea Fastening, Installation, Pre-commissioning and Commissioning of;


  • Wellhead platform complete with process and instrumentation piping
  • Process equipment facilities (Test and Production Separators, LACT Unit, WHCP, Chemical Injection Pumps, etc.)
  • 2.1km Pipe lay of 6’’x 0.5’’ wt 3LPE coated line Pipes
  • 2nos 6’’x 0.5’’ Risers complete with stand -off clamps.
  • 9km Pipe lay of 12’’x 0.5’’ wt 3LPE coated line Pipes
  • 2nos 12’’x 0.5’’ Risers complete with stand -off clamps and Riser Guards.
  • 42’’ Platform caisson, 3nos 24x1’’ Pile supports, Boat landing, Pig Launcher and Receiver Decks and associate Piping.
  • Inanga UA Platform Modification for Hook Up and Tie-in to 12’’ Production Header, 2’’ Vent Line, 4’’ Open and Closed Drain Headers.

JOB DESCRIPTION

  • Client representative for technical issues as concerns fabrication and construction and marine activities; Vessel Selection, Assurance and Fit for purpose Inspections and use.
  • Support Contractor in the generation of Detail Construction and Installation Engineering Documentations.
  • Guidance and Supervision of Contractor’s progress and reporting same to top management, highlighting risks and intervention areas.
  • Organization and Engineering of Constructability Reviews and Risk Analysis.
  • Review of all project construction engineering documentation to support fabrication and construction works.
  • Identify project scope changes and communicate same to all concerned as well as prepare job change notices for Contractor’s awareness.
  • Maintain awareness of Safety and Environmental requirements.
  • Provide primary line of communication between Company and Contractor.
  • Participate in the project critical forums to ensure that the scope of work is properly defined and that the project team has a clear understanding of the overall project expectation.

Project Coordinator

IndexPro Services Limited
Port Harcourt
06.2014 - 05.2015

PROJECT OVERVIEW

Client: Marine Platforms/ SNEPCO

Fabrication and Installation of structural packages for subsea activities.

Client: MSI Africa / Continental Oil & Gas Limited

Project Details:

Ango Pig Receiver - Deck Extension Project; A Turn-key provision of the engineered structural and piping package;

· One unit Multi Deck Extension

· Associated Process Piping to connect the pipeline Pig Receiver to the multi-phase metering skid

· Associated Process Piping to connect the metering skid to the tie-in point on the Production Platform.

Includes the performance of the following umbrella activities; Project Management, Detailed Engineering, Procurement, Fabrication, Load Out, Provision of HSE and Quality Assurance & Quality Control services.

JOB DESCRIPTION

  • Ensure that the right product is developed and delivered to meet Company’s quality standard and contract requirements.
  • Track project against its schedule, budget, and against the set-out objectives, and reporting status to top management and customer on a regular basis.
  • Develop and implement recovery plans for off-schedule and unanticipated occurrence.
  • Lead weekly project meetings in cooperation with project engineers.
  • Coordinate all Project Management Team personnel for project delivery in line with targets and deadline.
  • Review final check on all structural and piping shop drawings prior to transmittal to client.
  • Coordinate all project documentation.
  • Identify project scope changes and communicate same to all concerned as well as prepare job change notices for submittal to client.
  • Maintain awareness of Safety and Environmental requirements.
  • Review and approve key project documents including all aspect of construction drawings.
  • Provide primary line of communication with client.
  • Participate in the project proposal to ensure the scope of work is properly defined and that the project team has a clear understanding of it.

Engineering Coordinator

Subsurface & Surface Development Company Limited (SSDC)
Port Harcourt
03.2013 - 06.2014

PROJECT OVERVIEW

Project: Offshore Construction and Installation Program Phase 2 (OCIP II Fabrication Scope)

Project involves the fabrication services for all piping and structural components including appurtenances for the Maintenance of client's Offshore facilities

Client: ExxonMobil Nigeria Unlimited (MPN)


JOB DESCRIPTION

  • Conduct site inspection and verification + Compile detail technical report.
  • Responsible for IFC verification for Shop Drawings production, MTO etc.
  • Preparation of Work Order Proposal
  • Evaluate the scope of work on Approved Work Order and that of subcontracts.
  • Track and monitor design changes on the various IFC’s and documentations on the project.
  • Preparation of close out packages for final documentation on completed projects.
  • Coordinate all Project Management Team personnel for project delivery in line with targets and deadline.
  • Carry out final check on all structural and piping shop drawings prior to transmittal to client.
  • Coordinate all project documentation.
  • Planning & Scheduling, Cost Estimation and project execution for achieving organizational goals and policy.

Project/Methods & Installation Engineer

Adamac Group of Companies (TCO Marine, Sirpi Alusteel & Suffolk Petroleum Development Company)
Port Harcourt
03.2004 - 02.2013

PROJECT OVERVIEW

Clients

  • Mobil Producing Nigeria Unlimited - Major Integrity and Pipelines Scheme (MIPS Project), Offshore Construction and Installation Program Phase 1, Field Maintenance Services
  • Chevron Nigeria Limited (CNL) - Transportation and installation of pipelines, flow lines and offshore structures- offshore Escravos

Contract for the Engineering, Procurement and Installation (EPCI) services associated with Wellhead Hook-ups and Modifications, structural Inspections, pipeline and pipeline system repairs modifications, Well slot additions, packaged equipment procurement, process utility, firewater and other piping installations, vessels and tank repairs and installations, instrument and electrical installations and other integrity-related projects.

Project also include the inspection, testing, maintenance, repairs, fabrication and installation of flow lines, Deck Extensions, Pipe line integrity, Pressure vessels, Fire Water systems, Platform structures, Valves and Fittings, Cathodic Protection systems, Marine Risers and structural steel members, boat landing fenders, grit blasting and painting of structural steel and piping, pre-commissioning/commissioning.


JOB DESCRIPTION

  • Establish and maintain communication between the work crew and client representatives.
  • Develop detailed technical reports including work procedures. Supervise, coordinate and exercise functional authority for planning, organizing, control, integration and completion of construction activities in accordance with the required specifications and regulations.
  • Interface management with all parties involved offshore.
  • Ensure adherence of installation methods and quality control.
  • Manage all project reporting and change control in the field.
  • Ensure effective utilization of manpower and material resources for safe and timely work execution.

Education

B-Tech - Mechanical Engineering

R/S University of Science And Technology (RSUST)
Nigeria
02.1997 - 03.2002

Senior School Certificate Exams -

Baptist High School (BHS)
Nigeria
03.1987 - 06.1993

Certificate of Accomplishment - Project Management And Advanced P6

Ciel Consulting Group
Nigeria
08.2015 - 12.2015

No Degree - Project Management

University of Roehampton
London, UK
04.2001 -

Nigeria Society of Engineers (NSE)
Nigeria
08.2010 - 11.2010

Council For Regulation of Engineering in Nigeria
Nigeria
08.2011 - 12.2011

Skills

    Possess effective computer skills in MS Word, MS Excel, MS PowerPoint, MS Project, Primavera (P6) and AutoCAD Ability to study and interpret P&ID’s, Piping Isometric drawings, General arrangement and Equipment layout drawings, Structural drawings etc Possess a broad understanding of relevant engineering discipline with reference to the guiding codes and standards Possess good communication skills both verbal and written Possess effective management and leadership skills Possess effective analytical and Problem Solving Skills

undefined

Software

MS Office, AutoCAD, Primavera P6 Teckla Structures in view

Timeline

Construction Superintendent

Navante Oil and Gas Company Ltd.
10.2019 - Current

Certificate of Accomplishment - Project Management And Advanced P6

Ciel Consulting Group
08.2015 - 12.2015

Lead Construction Engineer

Johnkramer Nigeria Limited
07.2015 - 09.2019

Project Coordinator

IndexPro Services Limited
06.2014 - 05.2015

Engineering Coordinator

Subsurface & Surface Development Company Limited (SSDC)
03.2013 - 06.2014

Council For Regulation of Engineering in Nigeria
08.2011 - 12.2011

Nigeria Society of Engineers (NSE)
08.2010 - 11.2010

Project/Methods & Installation Engineer

Adamac Group of Companies (TCO Marine, Sirpi Alusteel & Suffolk Petroleum Development Company)
03.2004 - 02.2013

No Degree - Project Management

University of Roehampton
04.2001 -

B-Tech - Mechanical Engineering

R/S University of Science And Technology (RSUST)
02.1997 - 03.2002

Senior School Certificate Exams -

Baptist High School (BHS)
03.1987 - 06.1993
Abraham MacPeppleEngr.